Web Search
Welcome to APM Help
Using the APM Library
Glossary
What’s New in APM
What’s New in APM 26.0.0
What’s New in APM 25.0.2
What’s New in APM 25.0.1
What’s New in APM 25.0.0
What’s New in APM 24.0.3
What’s New in APM 24.0.2
What’s New in APM 24.0.1
What’s New in APM 24.0.0
What’s New in APM 7.23
What’s New in APM 7.22
What’s New in APM 7.21
What’s New in APM 7.20
What’s New in APM 7.19
What’s New in APM 7.18
What’s New in APM 7.17
What’s New in APM 7.16
What’s New in APM 7.15
What’s New in APM 7.14
What’s New in APM 7.13
What’s New in APM 7.12.5
What’s New in APM 7.12.4
What’s New in APM 7.12.3
What’s New in APM 7.12.2
What’s New in APM 7.12.1
APM User’s Guide
User Interface Navigation
Navigating in APM
APM Windows
Tool Bar Buttons, Shortcuts, and Menu Options
Exiting APM or Switching Users
Using the Find Bar to Open Objects
Creating a Shortcut from the Banner
Working with Trees
Viewing Information as a Table, Form, Chart, or Map
Using the Quick Search Bar
Entering Data in Tables
Exporting Table Configurations to Excel
Editing in Object Windows
Saving and Closing Objects
Emailing Shortcuts
Viewing Recently Opened Objects
Adding Inspection Photographs to Objects
Printing Documents
Refreshing Data
Using Drag-and-Drop
Working with Attachments
Adding Attachments to Objects
Viewing Attachments
Deleting Attachments
Personalizing the User Interface
Setting My Preferences
Hiding and Showing the Tool Bar
Turning the Find Bar On and Off
Creating Find Bar Sets
Turning the Banner On and Off
Selecting Views for the View Bar
Turning the View Bar On and Off
Table Configurations
Introduction to Table Configurations
About Table Configurations
Types of Table Configurations
Filter Criteria Concepts
Undoing Changes in Table Configurations
Managing Your Table Configurations
Reviewing Table Configurations
Setting a Default Table Configuration
Organizing Table Configurations
Deleting Table Configurations
Removing Sharing from a Table Configuration
Sharing a Table Configuration
Creating User Groups
Copying Table Configurations
Making Ad Hoc Changes to Table Configurations
Making Ad Hoc Changes to Table Configurations
Changing the Order of Columns on an Ad Hoc Basis
Resizing Columns on an Ad Hoc Basis
Hiding Columns on an Ad Hoc Basis
Showing Columns on an Ad Hoc Basis
Freezing or Unfreezing Columns on an Ad Hoc Basis
Filtering Data in Tables
Sorting Data in Tables
Grouping and Ungrouping by Columns on an Ad Hoc Basis
Changing Column Properties on an Ad Hoc Basis
Saving Ad Hoc Changes in the Current Configuration
Saving Ad Hoc Changes as a New Table Configuration
Undoing Ad Hoc Changes in Table Configurations
Editing Table Configurations
Adding and Removing Columns in a Table Configuration
Changing the Order of Columns in Table Configurations
Setting Icon Sizes
Applying Mass Updates
Viewing Mass Update Requests
Formatting Row Data in Table Configurations
Editing the Default Theme
Creating a Table Configuration
Defining Column Properties
Editing Column Properties in Table Configurations
Including or Excluding Columns in Quick Searches
Creating Data Groups in Table Configurations
Creating Count Columns for Table Configurations
Defining Filter Properties
Creating Filters for Table Configurations
Viewing Filters for Table Configurations
Applying Run-time Settings to a Filter Criterion
Creating Filter Groups for Table Configurations
Adding Conditions to Table Configurations
Deleting Conditions or Groups for Table Configurations
Defining Sorting Properties
Entering Sorting Criteria for Table Configurations
Changing the Sort Sequence in Table Configurations
Defining View as Table Appearance Properties
Defining View as Form Appearance Properties
Defining View as Chart Appearance Properties
Defining View as Chart Appearance Properties
Defining Custom Data Series for a Chart
Defining a Secondary Data Series for a Chart
Creating a Legend for a Chart
Creating Cross Hair Settings for a Chart
Defining an Axis for a Chart
Defining a Stripline for a Chart
Defining Variable Graph Appearances for a Chart
Defining View as Map Appearance Properties
Defining Base Map Options
Adding Map Layers to a Configuration
Viewing Map Information
Setting Map Coordinates
Adding Custom Buttons to Table Configurations
Setting Options for Table Configurations
Favorites
Overview of Favorites
Creating a Favorite
Working with Favorites
Deleting Favorites
APM and AssetWise Enterprise Interoperability
Introduction to APM with AWEIS
Viewing AWEIS Objects in APM
Overview of Setting up APM for AWEIS
APM Interoperability with SAP Plant Maintenance
Introduction to APM Interoperability with SAP
Viewing SAP Plant Maintenance Data in APM
Working with Reminders
Assets
Introduction to Assets
Overview of Assets
Asset Hierarchies
Asset Downtime
Asset Activity Reports
Assemblies
Costs and Indicators for Assets
Creating Assets
Creating an Organization Asset
Creating a Maintainable Asset
Creating a Measurement Device Asset
Creating a System or Subsystem Asset
Creating an Asset Group
Creating a Component Location
Creating a Component Asset
Creating Multiple Child Assets
Copying Assets
Working with Assets
Adding Regulatory Information to an Asset
Adding Operating Parameters to an Asset
Adding Documents to an Asset
Working with Asset Notes
Adding Degradation Information to an Asset
Working with Asset Circuits
Adding Purchase and Manufacturer Information to an Asset
Adding Warranty Information to an Asset
Creating a Parts List for an Asset
Adding Barriers to an Asset
Setting up Production Loss Rules on an Asset
Changing an Asset’s Primary Function
Working with Assets and SAP Plant Maintenance Information
Changing an Asset's Status
Changing or Assigning the Parent Asset for Multiple Assets
Entering Hierarchy Codes for Assets
Enabling and Disabling Construction of Hierarchy Locations
Updating Asset Age
Creating Assemblies
Creating an Assembly in the Physical Hierarchy
Adding Component Locations for an Assembly
Setting up a Component Hierarchy for an Assembly
Installing a Component
Uninstalling (or Removing) a Component
Viewing Asset Information
Viewing Asset Information
Viewing Asset-Focused Overviews
Viewing Asset Comparisons
Viewing Asset Risk Summaries
Setting up and Viewing Linked Assets
Creating a Shortcut to an Asset
Viewing an Asset’s Audit History
Viewing an Asset’s Status History
Viewing an Asset’s Installation History
Viewing Downtime Incidents
Reviewing and Closing Downtime Incidents
Viewing Production Loss Summaries
Viewing Warranties for an Asset
Viewing an Asset’s Standard Problems, Causes, and Remedies
Viewing an Asset’s Asset Health Information
Viewing System Information for Assets
Asset Activity Reports
Creating Asset Activity Reports
Creating an Asset Activity Report
Adding Attachments to an Asset Activity Report
Adding Attachments to an Asset Activity Report Section
Working With Asset Activity Reports
Changing Asset Activity Report Information
Changing Asset Activity Report Section Information
Changing the Status of an Asset Activity Report
Assigning Asset Activity Report Details
Assigning an Asset Activity Report Team
Assigning Asset Activity Report Printing and Publishing Options
Adding a Section to an Asset Activity Report
Copying an Asset Activity Report
Printing an Asset Activity Report
Printing an Asset Activity Report Edition
Sending an Asset Activity Report for Approval
Publishing an Asset Activity Report
Viewing Asset Activity Reports
Viewing Asset Activity Report Information
Viewing Asset Activity Report Section Details
Viewing Asset Activity Report Audit History
Viewing Reports that Include an Asset Activity Report
Asset Program Profiles
Setting up Asset Program Profiles
Adding Filters to Asset Program Profile Details
Generating Asset Program Profiles
Working with Asset Lives
Starting a New Asset Life
Undoing Asset Life Changes
Viewing an Asset’s Costs by Asset Life
Viewing Manufacturer Information for an Asset’s Life
Viewing an Asset’s Life History
Asset Transfer Documents
Creating an Asset Transfer Document
Transferring Assets
Receiving Assets
Viewing Asset Transfer History
Asset Change Requests
Introduction to Asset Change Requests
Creating Asset Properties Change Requests
Sending an Asset Properties Change Request for Approval
Reviewing Asset Properties Change Requests
Creating Equipment Removal Requests
Strategy Development
Asset Prioritization
Introduction to Asset Prioritization Analysis
Overview of Asset Prioritization Analysis
Setting up APM for Asset Prioritization Analysis
Glossary of Asset Prioritization Terms
Creating and Managing Asset Prioritization Analyses
Creating an Asset Prioritization Analysis
Adding Team Members to a Prioritization Analysis
Entering and Reviewing Comments on a Prioritization Analysis
Recording Team Meetings on a Prioritization Analysis
Working with the Prioritization Analysis Checklist
Performing Asset Prioritization Analysis
Identifying Assets for Prioritization Analysis
Recording Prioritization Analysis Assumptions
Entering Prioritization Results
Applying Prioritization Analysis Results to Assets
Working with Asset Prioritization Analyses
Creating Projects for Prioritization Analyses
Linking Prioritization Analyses to Condition Analyses
Revising Prioritization Analyses
Viewing Asset Prioritization Information
Printing Asset Prioritization Reports
Current Practice Review
Introduction to Current Practice Review
Overview of Current Practice Review
Overview of Performing Current Practice Reviews
Setting up APM for Current Practice Review
Glossary of CPR Terms
Creating and Managing Current Practice Reviews
Creating a Current Practice Review
Setting Failure Mode Options for a Current Practice Review
Adding Assets to a Current Practice Review
Working with Asset Scope on a Current Practice Review
Recording the Primary Asset’s Operating Context on a CPR
Adding Team Members to a Current Practice Review
Entering and Reviewing Comments on Current Practice Reviews
Recording Team Meetings on a Current Practice Review
Working with the Current Practice Review Checklist
Developing CPR Action Plans
Creating CPR Action Plans in APM
Importing CPR Action Plans From an Excel File
Creating Secondary CPR Action Plans
Adding Inspection Tasks and Indicators to CPR Action Plans
Adding Corrective Tasks to CPR Action Plans
Adding Critical Parts to CPR Action Plans
Adding Follow-up Work to CPR Action Plans
Reviewing Indicator Collection Information on a Review
Adding Standard Documents to CPR Action Plans
Reviewing CPR Action Plan Details
Copying CPR Action Plans
Overview of the Copy Failure Mode Wizard
Setting Mapping Options for a Failure Mode Copy
Browsing for Failure Modes to Add to a CPR
Copying Failure Modes to CPR
Copying an Asset’s Strategy Development Program
Revisiting CPR Failure Mode Copy Requests
Working with Current Practice Reviews
Converting a CPR to an MTA2 or RBI
Renumbering Assets and Action Plans in a CPR
Changing the Status of Action Plans and Current Practice Reviews
Sending a Current Practice Review for Approval
Working with CPR Action Plan Task Statuses
Viewing Information About a CPR
Reviewing CPR Assets’ Reliability Programs
Printing CPR Reports
Linking CPR Action Plans to Projects
Working With a Project’s Links to CPR Action Plans
Changing the Primary Asset on a CPR
Updating the Asset Hierarchy Snapshot for a CPR
Viewing CPR Action Plans for Standard Tasks and Jobs
Reliability Strategy Selection
Introduction to Reliability Strategy Selection
Overview of Reliability Strategy Selection
Two Ways to Access RSS Analyses
Setting up APM for RSS Analysis
Glossary of RSS Terms
Creating and Managing RSS Analyses
Creating an RSS Analysis
Adding Team Members to an RSS Analysis
Entering and Reviewing Comments on an RSS Analysis
Recording Team Meetings on an RSS Analysis
Working with the RSS Analysis Checklist
Performing RSS Analysis
Using the RSS Questionnaire
Sending RSS Analyses for Approval
Implementing a Recommended Strategy
Tracking the Escalation Process on an RSS Analysis
Strategy Development Analysis Studies
Creating an SDA Study
Maintenance Task Analysis
Introduction to Maintenance Task Analysis
Overview of Maintenance Task Analysis
Overview of Risk Analysis
Overview of Performing Maintenance Task Analysis
Two Ways to Access Maintenance Task Analyses
Reusing MTA2 Failure Modes
Setting up APM for Maintenance Task Analysis
Glossary of MTA2 Terms
Creating and Managing Maintenance Task Analyses
Creating an MTA2 from Scratch
Creating an MTA2 From a Template
Setting Failure Mode Options for an MTA2
Setting Risk Analysis Options for an MTA2
Adding Assets to an MTA2
Working with Asset Scope on an MTA2
Recording the Primary Asset’s Operating Context for an MTA2
Adding Team Members to an MTA2
Entering and Reviewing Comments on an MTA2
Recording Team Meetings on an MTA2
Working with the MTA2 Checklist
Developing MTA2 Failure Modes
Creating MTA2 Failure Modes
Creating Analysis Requests for MTA2 Failure Modes
Evaluating Susceptibility to Failure for MTA2 Failure Modes
Performing MTA2 Failure Mode Risk Analysis
Performing MTA2 Risk Analysis with Weighted Severities
Performing MTA2 Demand Scenario Risk Analysis
Viewing Risk Analyses for MTA2 Failure Modes
Recording MTA2 Failure Data
Evaluating the Feasibility of MTA2 Maintenance Tasks
Recording and Reviewing MTA2 Failure Mode Details
Adding Symptoms to an MTA2 Failure Mode
Developing MTA2 Action Plans
Developing Primary MTA2 Action Plans
Creating Secondary MTA2 Action Plans
Calculating a Failure-Finding Interval for an MTA2 Action Plan
Adding Inspection Tasks and Indicators to MTA2 Action Plans
Adding Corrective Tasks to MTA2 Action Plans
Adding Critical Parts to MTA2 Action Plans
Adding Follow-up Work to MTA2 Action Plans
Reviewing Indicator Collection Information on an MTA2
Adding Standard Documents to MTA2 Action Plans
Copying MTA2 Failure Modes
Overview of the Copy Failure Modes Wizard
Setting Mapping Options for a Failure Mode Copy
Browsing for Failure Modes to Add to an MTA2 or Template
Copying Failure Modes to an MTA2 or Template
Copying an Asset’s Strategy Development Program
Revisiting MTA2 Failure Mode Copy Requests
Working with Maintenance Task Analyses
Renumbering Assets and MTA2 Failure Modes
Changing the Status of MTA2 Failure Modes and Analyses
Sending an MTA2 for Approval
Working with MTA2 Action Plan Task Statuses
Viewing Information About an MTA2 or Template
Reviewing MTA2 Assets’ Reliability Programs
Printing MTA2 Reports
Linking MTA2 Action Plans to Projects
Working With a Project’s Links to MTA2 Action Plans
Changing the Primary Asset on an MTA2
Updating the Asset Hierarchy Snapshot for an MTA2
Viewing MTA2 Failure Modes and Action Plans
Viewing MTA2 Failure Modes for Standard Tasks and Jobs
Editing an Asset’s MTA2 Failure Modes
MTA2 Templates
Creating an MTA2 Template
Setting up a Hierarchy for MTA2 Templates
Viewing MTA2 Template Hierarchies
Moving an MTA2 Template to a Different Site
Design FMECA
Introduction to Design FMECA
Overview of Design FMECA
Overview of Failure Mode Risk Analysis
Overview of Performing Design FMECAs
Setting up APM for Design FMECA
Glossary of Design FMECA Terms
Creating and Managing Design FMECAs
Setting up a Hierarchy for Design FMECAs
Creating a Design FMECA
Planning a Design FMECA
Setting Failure Mode Options for a Design FMECA
Setting Risk Analysis Options for a Design FMECA
Recording the Asset’s Operating Context on a Design FMECA
Adding Team Members to a Design FMECA
Entering and Reviewing Comments on a Design FMECA
Recording Team Meetings on a Design FMECA
Working with the Design FMECA Checklist
Developing FMECA Failure Modes
Developing Design FMECA Functions and Failure Modes
Performing Design FMECA Failure Mode Risk Analysis
Performing Design FMECA Risk Analysis with Weighted Severities
Recording Failure Data for Design FMECAs
Evaluating Design FMECA Failure Mode Consequences
Evaluating the Feasibility of Design FMECA Maintenance Tasks
Developing Design FMECA Action Plans
Developing Primary FMECA Action Plans
Creating Secondary FMECA Action Plans
Calculating a Failure-Finding Interval for a Design FMECA
Adding Indicator Templates to FMECA Action Plans
Adding Task and Job Templates to FMECA Action Plans
Adding Critical Parts to FMECA Action Plans
Adding Standard Documents to FMECA Action Plans
Viewing the Decision Diagram for a Design FMECA
Copying Design FMECA Failure Modes
Overview of the Copy Failure Mode Wizard
Setting Mapping Options for a Failure Mode Copy
Browsing for Functions and Functional Failures
Copying Failure Modes to a New Design FMECA
Browsing for Failure Modes to Add to a Design FMECA
Revisiting FMECA Failure Mode Copy Requests
Working with Design FMECAs
Renumbering Design FMECA Objects
Changing the Status of FMECA Failure Modes and Analyses
Viewing Information About a Design FMECA
Printing Design FMECA Reports
Linking FMECA Action Plans to Projects
Working With a Project’s Links to FMECA Action Plans
RCM2 Analysis
Introduction to RCM2 Analysis
Overview of RCM2 Analysis
Overview of Failure Mode Risk Analysis
Overview of Performing RCM2 Analysis
Two Ways to Access RCM2 Analyses
Reusing RCM2 Functions and Failure Modes
Setting up APM for RCM2 Analysis
Glossary of RCM2 Terms
Creating and Managing RCM2 Analyses
Creating an RCM2 Analysis From Scratch
Creating an RCM2 Analysis From a Template
Setting Failure Mode Options for an RCM2 Analysis
Setting Risk Analysis Options for an RCM2 Analysis
Adding Assets to an RCM2 Analysis
Recording the Primary Asset’s Operating Context on an RCM2 Analysis
Adding Team Members to an RCM2 Analysis
Entering and Reviewing Comments on an RCM2 Analysis
Recording Team Meetings on an RCM2 Analysis
Working with the RCM2 Analysis Checklist
Developing FMECA Failure Modes
Developing RCM2 Functions and Failure Modes
Creating Analysis Requests for RCM2 Failure Modes
Evaluating Susceptibility to Failure for RCM2 Failure Modes
Performing RCM2 Failure Mode Risk Analysis
Performing RCM2 Risk Analysis with Weighted Severities
Viewing Risk Analyses for RCM2 Failure Modes
Recording Failure Data for RCM2 Analyses
Evaluating RCM2 Failure Mode Consequences
Evaluating the Feasibility of RCM2 Maintenance Tasks
Recording and Reviewing RCM2 Failure Mode Details
Adding Symptoms to an RCM2 Failure Mode
Developing RCM2 Action Plans
Developing Primary RCM2 Action Plans
Creating Secondary RCM2 Action Plans
Calculating a Failure-Finding Interval for an RCM2 Analysis
Adding Inspection Tasks and Indicators to RCM2 Action Plans
Adding Corrective Tasks to RCM2 Action Plans
Adding Critical Parts to RCM2 Action Plans
Adding Follow-up Work to RCM2 Action Plans
Reviewing Indicator Collection Information on an RCM2
Adding Standard Documents to RCM2 Action Plans
Viewing the Decision Diagram for an RCM2 Analysis
Copying RCM2 Failure Modes
Overview of the Copy Failure Mode Wizard
Setting Mapping Options for a Failure Mode Copy
Browsing for RCM2 Functions and Functional Failures
Browsing for Failure Modes for an RCM2 Analysis or Template
Copying Failure Modes to an RCM2 Analysis or Template
Copying an Asset’s Strategy Development Program
Revisiting RCM2 Failure Mode Copy Requests
Working with RCM2 Analyses
Renumbering RCM2 Analysis Objects
Changing the Status of RCM2 Failure Modes and Analyses
Sending an RCM2 Analysis for Approval
Working with RCM2 Action Plan Task Statuses
Viewing Information About an RCM2 Analysis or Template
Reviewing RCM2 Assets’ Reliability Programs
Printing RCM2 Analysis Reports
Linking RCM2 Action Plans to Projects
Working With a Project’s Links to RCM2 Action Plans
Changing the Primary Asset on an RCM2 Analysis
Viewing RCM2 Failure Modes and Action Plans
Viewing RCM2 Failure Modes for Standard Tasks and Jobs
Editing an Asset’s RCM2 Failure Modes
RCM2 Templates
Creating an RCM2 Template
Setting up a Hierarchy for RCM2 Templates
Viewing RCM2 Template Hierarchies
Moving an RCM2 Template to a Different Site
Risk-based Inspection Analysis
Introduction to RBI Analysis
Overview of Risk-based Inspection Analysis
RBI Concepts
RBI Calculations
Overview of Performing RBI Analysis
Two Ways to Access RBI Analyses
Setting up APM for RBI Analysis
Glossary of RBI Terms
Creating and Managing RBI Analyses
Creating an RBI Analysis
Setting Failure Mode Options for an RBI Analysis
Setting Risk Analysis Options for an RBI Analysis
Adding Assets to an RBI Analysis
Working with Asset Scope on an RBI Analysis
Recording the Primary Asset’s Operating Context for an RBI
Adding Team Members to an RBI Analysis
Entering and Reviewing Comments on an RBI Analysis
Recording Team Meetings on an RBI Analysis
Working with the RBI Analysis Checklist
Developing RBI Failure Modes
Adding Failure Modes to the RBI Damage Mechanisms Library
Adding Failure Modes to an RBI Analysis
Recording Degradation Data on RBI Failure Modes
Adding Barriers to RBI Failure Modes
Working with Barriers on RBI Failure Modes
Adding Degradation Rates to RBI Failure Modes
Evaluating Susceptibility to Failure for RBI Failure Modes
Performing Risk Analysis for RBI Failure Modes
Performing RBI Risk Analysis with Weighted Severities
Performing RBI Demand Scenario Risk Analysis
Viewing Risk Analyses for RBI Failure Modes
Recording Failure Data for RBI Failure Modes
Evaluating the Feasibility of RBI Maintenance Tasks
Recording and Reviewing RBI Failure Mode Details
Adding Symptoms to a RBI Failure Mode
Developing RBI Action Plans
Developing Primary RBI Action Plans
Creating Secondary RBI Action Plans
Adding Inspection Tasks and Indicators to RBI Action Plans
Adding Corrective Tasks to RBI Action Plans
Adding Critical Parts to RBI Action Plans
Adding Follow-up Work to RBI Action Plans
Reviewing Indicator Collection Information on an RBI Analysis
Adding Standard Documents to RBI Action Plans
Copying Failure Modes for RBI Analyses
Overview of the Copy Failure Modes Wizard
Setting Mapping Options for a Failure Mode Copy
Browsing for Failure Modes to Add to an RBI Analysis
Copying Failure Modes to an RBI Analysis
Copying an Asset’s Strategy Development Program
Revisiting RBI Failure Mode Copy Requests
Working with RBI Analyses
Renumbering Assets and RBI Failure Modes
Changing the Status of RBI Failure Modes and Analyses
Sending an RBI Analysis for Approval
Working with RBI Action Plan Task Statuses
Viewing Information About an RBI Analysis
Reviewing RBI Assets’ Reliability Programs
Printing RBI Analysis Reports
Linking RBI Action Plans to Projects
Working With a Project’s Links to RBI Action Plans
Changing the Primary Asset on an RBI Analysis
Updating the Asset Hierarchy Snapshot for an RBI Analysis
Viewing RBI Failure Modes and Action Plans
Viewing RBI Failure Modes for Standard Tasks and Jobs
Safety Instrumented Function Analysis
Introduction to SIF Analysis
Overview of SIF Analysis
Two Ways to Access SIF Analyses
Overview of Performing SIF Analysis
Setting up APM for SIF Analysis
Glossary of SIF Terms
Creating and Managing SIF Analyses
Creating a SIF Analysis from Scratch
Creating a SIF Analysis From a Template
Setting Failure Mode Options for a SIF Analysis
Setting Risk Analysis Options for a SIF Analysis
Adding Assets to a SIF Analysis
Working with Asset Scope on a SIF Analysis
Recording the Primary Asset’s Operating Context for a SIF Analysis
Adding Team Members to a SIF Analysis
Entering and Reviewing Comments on a SIF Analysis
Recording Team Meetings on a SIF Analysis
Working with the SIF Analysis Checklist
Developing SIF Failure Modes
Creating Unwanted Situations
Creating SIF Failure Modes
Performing SIF Failure Mode Risk Analysis
Adding Provisions to a SIF Failure Mode
Developing Primary SIF Action Plans
Creating Secondary SIF Action Plans
Calculating a Failure-Finding Interval for a SIF Action Plan
Adding Inspection Tasks and Indicators to SIF Action Plans
Adding Corrective Tasks to SIF Action Plans
Adding Critical Parts to SIF Action Plans
Adding Follow-up Work to SIF Action Plans
Reviewing Indicator Collection Information on a SIF Analysis
Adding Standard Documents to SIF Action Plans
Copying SIF Failure Modes
Overview of the Copy Failure Modes Wizard
Setting Mapping Options for a Failure Mode Copy
Browsing for Failure Modes to Add to a SIF Analysis
Copying Failure Modes to a SIF Analysis or Template
Copying an Asset’s Strategy Development Program
Revisiting SIF Failure Mode Copy Requests
Working with SIF Analyses
Renumbering Assets and SIF Failure Modes
Changing the Status of SIF Failure Modes and Analyses
Sending a SIF Analysis for Approval
Updating Study Status using a Change Set
Working with SIF Action Plan Task Statuses
Viewing Information About a SIF Analysis or Template
Reviewing SIF Assets’ Reliability Programs
Printing SIF Analysis Reports
Linking SIF Action Plans to Projects
Working With a Project’s Links to SIF Action Plans
Changing the Primary Asset on a SIF Analysis
Viewing SIF Failure Modes and Action Plans
Viewing SIF Failure Modes for Standard Tasks and Jobs
Editing an Asset’s SIF Failure Modes
SIF Templates
Creating a SIF Template
Setting up a Hierarchy for SIF Templates
Viewing SIF Template Hierarchies
Moving a SIF Template to a Different Site
Importing Criticality Evaluations into Failure Modes
Failure Mode Comparison
Asset Reliability Programs
Asset Reliability Programs
Defining an Asset Reliability Program
Reviewing Assets’ Reliability Programs
Reviewing an Asset’s Upcoming Work
Defining Shutdowns
Manually Triggering Work Orders from an Asset Reliability Program
Defining PM Generation Profiles
Generating PM Work Orders for the Site
Generating PM Work Orders for an Asset and Its Descendants
Creating an Asset Reliability Program Using Job Templates
Viewing Reliability Program Work History
Failure Tracking
Introduction to Failure Tracking
What is Failure Tracking?
Failure Statistics
Tasks Involved in Failure Tracking
Setup Tasks for Failure Tracking
Glossary of Failure Tracking Terms
Creating Failure Records
Creating a Failure Record From Scratch
Creating a Failure when Acknowledging an Alarm
Creating a Failure Record from a Checksheet
Creating a Failure Record from an Inspection Report
Creating a Failure when Linking a Work Request to a Task
Creating a Failure Record from a Work Order Task
Linking a Work Order Task to a Failure Record
Linking a Failure Record to a Work Document
Creating a Failure Record When Reporting Work Activity
Working with Failure Tracking
Adding Indicators to a Failure Record
Entering and Reviewing Comments on a Failure
Editing Failure Records
Adding Mitigation Actions to Failure Records
Adding Follow-up Work to Failure Records
Adding Inspection Tasks to Failure Records
Adding Downtime to Failure Records
Adding Delays to Failure Records
Evaluating Failures for RCA
Creating an RCA from a Failure
Resolving a Failure
Canceling a Failure Record
Reopening a Failure Record
Marking Failure Records for Update
Manually Recalculating Failure Statistics and PF Intervals
Updating Failure Settings on Indicator States
Working with Failure Information
Viewing a Failure’s Remaining PF Interval
Viewing Failure Status
Viewing the Indicators and Readings that Track a Failure
Viewing Information About a Failure’s Resolution
Viewing a Failure Record’s Source
Viewing Snapshots of Asset Information
Viewing Failure Record History
Viewing Failure Statistics
Root Cause Analysis (RCA)
Introduction to RCA
Overview of RCA
Setting up APM for RCA
Glossary of RCA Terms
Creating and Managing the Analysis
Creating a Root Cause Analysis
Adding Team Members to a Root Cause Analysis
Entering and Reviewing Comments on an RCA
Recording Team Meetings on an RCA
Working with the RCA Checklist
Performing Root Cause Analysis
Defining the Problem
Performing a Root Cause Analysis
Identifying Cause Classifications
Sending an RCA for Approval
Creating Solutions for Root Causes
Printing RCA Reports
Inspection Management
Introduction to Inspection Management
Indicators, Types, and Value Categories
Degradation Indicators
Indicator Readings
Indicator Collection Dates: Calculations, Windows, and Compliance Tracking
Indicator Templates
Indicator States and Alarms
Alarm Notification
Triggering Work Based on Indicator States and Alarms
Inspection Reports
Modification and Repair Inspection Checksheets
Setting up Asset Indicators
Creating a Descriptive Indicator
Creating a Basic Numeric Indicator
Creating a Degradation Indicator
Adding Measurement Points to an Indicator
Linking Numeric Indicator Readings
Adding States and Alarms to an Indicator or Template
Creating an Indicator State Calculation Record
Creating a Cumulative Indicator
Cascading Indicator Readings to Other Assets
Selecting a Primary Cumulative Indicator for an Asset
Creating a Rule-based Indicator
Creating Multiple Indicators
Creating Indicators for Multiple Assets
Copying Indicators to Assets
Copying Indicators from Other Assets
Creating Indicators from Indicator Templates
Creating Calculated Indicators
Introduction to Calculated Indicators
Creating a Calculated Numeric Indicator
Creating a Calculated Cumulative Indicator
Creating a Calculated Descriptive Indicator
Creating Calculation Inputs Based on Indicator Readings
Creating Calculation Inputs Based on Other Reading Data
Creating Calculation Inputs Based on Filters
Defining an Indicator’s Calculation Frequency
Using Logical Operators and Functions
Using a String in a Calculated Indicator
Using an Enumerated Attribute in a Calculated Indicator
Using a Boolean Attribute in a Calculated Indicator
Using an Array in a Calculated Indicator
Using a Date Attribute in a Calculated Indicator
Operators for Calculated Indicators
Troubleshooting a Calculated Indicator
Creating 4D Calculated Indicators
Introduction to 4D Indicators for Large Data Sets
Setting up APM for 4D Indicators
Enabling the Product Feature
Creating 4D Analytics Connections
Setting up the GraphQL Service Provider
Setting Site Properties
Setting up Scheduled Actions to Execute 4D Calculations
Modifying Indicator Types
Setting up Logging for 4D Calculated Indicators
Command Line Options for the Calculation Engine
Introduction to 4D Calculated Indicators
Setting up 4D Calculated Indicators
Creating 4D Calculated Indicators
Adding States and Alarms to a 4D Indicator
Creating 4D Calculation Inputs Based on Indicator Readings
Creating 4D Calculation Inputs Based on Other Reading Data
Creating 4D Calculation Inputs Based on Filters
Viewing 4D Indicators and Readings
Creating Comparative Analyses for 4D Indicators
Creating Indicator Templates
Creating a Template from an Indicator
Creating a Cumulative Indicator Template
Creating a Numeric Indicator Template
Creating a Calculated Indicator Template
Creating a Descriptive Indicator Template
Creating a Rule-based Indicator Template
Moving Indicator Templates to a Different Site
Viewing Where Indicator Templates are Used
Working With Indicators
Tracking the Inspection Effectiveness of Indicators
Deactivating Reading Collection on an Indicator
Adding an Indicator to an Inspection Task
Changing an Indicator’s Degradation Rate
Resetting an Indicator’s Degradation Rate
Changing an Indicator’s Next Collection Date
Changing an Indicator’s Asset
Resetting an Indicator
Linking an Indicator to a Template
Publishing Readings to an External System
Working with Indicator Checksheets
Creating Checksheets
Checksheets and SAP Plant Maintenance
Printing a Checksheet Form or Inspection Summary Report
Exporting and Importing Checksheet Readings
Entering Readings on a Checksheet
Working with Inspection Documents on a Checksheet
Sending a Checksheet for Approval
Processing Checksheets
Entering Indicator Readings
Entering Ad Hoc Indicator Readings
Marking an Asset as Unavailable For Reading
Undoing the Asset-is-Unavailable Flag
Adding Attachments to an Indicator Reading
Marking a Reading as Being Fixed During Inspection
Undoing the Fixed During Inspection Flag
Correcting an Indicator Reading
Marking an Indicator Reading as Incorrect
Requesting a Failure Mode Review for an Indicator
Requesting Follow-up Work for an Indicator Reading
Manually Recalculating a Calculated Indicator
Recalculating Calculated Indicators and KPIs for a Site
Working with Inspection Reports
Creating an Inspection Report
Working with an Inspection Report
Requesting Follow-up Work from an Inspection Report
Designating Readings as Regulatory
Adding a Photograph to an Inspection Report
Updating Next Inspection Dates
Sending an Inspection Report for Approval
Printing Inspection Reports
Viewing Inspection Tasks
Viewing Indicator Information
Working with the Inspection Analytics Tab
Viewing Indicators and Failure Modes
Viewing Indicator Usage
Checking the Current State of Indicators
Viewing Indicator Collection Compliance
Viewing Indicator States for a Site or Asset
Viewing Attachments on an Indicator Reading
Viewing Calculation Times
Viewing Audit Information About Indicators
Indicator Alarms
Using Indicator Alarms to Trigger Work
Suggesting Standard Jobs or Tasks for Indicator Alarms
Acknowledging Indicator Alarms and Warnings
Undoing Alarm Acknowledgments
Configuring Indicators for ODC
Overview of Online Data Collection
Configuring Indicators to Collect Online Data
Mapping Values For Descriptive Indicators
Configuring ODC Reading Creation Rules
Viewing ODC Polling Messages
Working with Mobile Checksheet Activities
Assigning Checksheets to a Mobile Device
Viewing Mobile Checksheet Assignments
Checking the Status of Mobile Checksheet Activities
Comparing Indicators
Overview of Comparative Analysis
Creating a Basic Comparative Analysis
Creating an Advanced Comparative Analysis
Creating a Degradation Comparative Analysis
Performing Actions on Indicator Readings Shown in a Graph
Zooming In and Out on a Graph
Creating an Ad Hoc Comparative Analysis from Indicators
Performance Indicators
Introduction to Performance Indicators
Creating a Performance Indicator from Scratch
Creating Performance Indicators From a Template
Modifying a Performance Indicator Created From a KPI Template
Creating a Performance Indicator Template
Creating Regular Filter Criteria
Creating Variable Filter Criteria
Adding Site Filters to Performance Indicators
Changing the Order of Filtering Criteria
Defining a Performance Indicator’s Calculation Frequency
Recalculating Calculated and Performance Indicators for a Site
Manually Recalculating a Performance Indicator
Viewing Calculation Input Values
Viewing Chart or Gauge Details from the Readings View
Checking the Current State of a Performance Indicator
Modification and Repair Inspection Checksheets
Preparing a Modification and Repair Inspection Checksheet
Completing a Modification and Repair Inspection Checksheet
Dashboards
Overview of Dashboards
Viewing Dashboards
Defining Site Dashboards
Defining Sidebar Dashboards
Fluid Condition Tracking
Introduction to Fluid Condition Tracking
Overview of Fluid Condition Tracking
Setting up APM for Fluid Sample and Condition Tracking
Glossary of Fluid Condition Terms
Setting up Checksheets for Fluid Condition Tracking
Setting up Indicator Templates for Fluid Sample Collection
Setting up Indicators to Record Rates of Change
Setting up Task Templates for Fluid Condition Tracking
Working with Fluid Samples
Entering Fluid Sample Indicator Readings
Creating Fluid Sample Receipts and Sending Samples to the Lab
Reviewing Fluid Sample Test Results
Asset Health Monitoring
Introduction to Asset Health Monitoring
What is Asset Health Monitoring?
Tasks Involved in Asset Health Monitoring
Setting up APM for Asset Health Monitoring
Asset Health Glossary
Asset Health Report Definitions
Asset Health Report Definitions
Creating an Asset Health Report Definition
Setting up a Recurrence Pattern for Report Readings
Selecting Assets for an Asset Health Report Definition
Selection Criteria Concepts for Asset Health Assets
Creating a Filter Criterion Based on an Attribute
Creating a Filter Criterion Based on a Relationship
Copying an Asset Health Report Definition
Manually Generating Asset Health Readings
Creating Asset Health Calculations
Creating a Calculation Record
Using Logical Operators in Calculations
Operators for Calculation Variables
Creating an Asset Health Calculation State
Assigning Asset Health Calculation Details
Creating Asset Health Calculation Variables
Creating an Asset Health Calculation Type Variable
Creating an Asset Health Filter Type Variable
Creating a Global Variable Type Variable
Creating a Join Path Type Variable
Defining a Factor Table for an Asset Health Variable
Assigning Calculation Variable Limits and Weighting
Assigning Null Value Behavior
Testing an Asset Health Calculation
Viewing Audit History
Working With Asset Health Reports
Generating All Asset Health Report Readings
Regenerating Asset Health Report Readings
Resuming Readings Generation
Sending an Asset Health Report for Approval
Publishing an Asset Health Report
Changing an Asset Health Report Status
Viewing Asset Health Information
Viewing Asset Health Indexes
Viewing Asset Health Index Readings
Viewing Asset Health Readings from the Site
Viewing Asset Health Calculation Readings for an Asset
Viewing Most Recently Published Reports
Viewing an Asset Health Report Analysis
Viewing an Asset Health Report Error Readings
Asset Condition Analysis and Restoration Plans
Asset Condition Analysis
Introduction to Asset Condition Analysis
Creating and Managing Condition Analyses
Creating an Asset Condition Analysis
Adding Team Members to an Asset Condition Analysis
Entering and Reviewing Comments on an ACA
Recording Team Meetings on an Asset Condition Analysis
Working with the Analysis Checklist
Performing Asset Condition Analysis
Identifying Assets for Condition Analysis
Analyzing Asset Condition
Applying Condition Analysis Results to Assets
Working with Asset Condition Analyses
Creating Projects for Asset Condition Analyses
Viewing Asset Condition Information
Printing Asset Condition Reports
Asset Restoration Plans
Introduction to Asset Restoration Plans
Creating an Asset Restoration Plan from an ACA
Creating an Asset Restoration Plan from Scratch
Adding Assets to a Restoration Plan
Developing an Asset’s Spending Plan
Linking Restoration Plan Assets to Projects
Reviewing Plan Costs and Information
Changing a Restoration Plan’s Financial Periods
Changing a Restoration Plan’s or Asset’s Status
Standard Tasks, Standard Jobs, and Templates
Introduction to Standard Tasks and Jobs
Work Standards
Dynamic Inspection Routes
Work Templates
Setting up Standard Tasks
Creating a Standard Task from a Template
Using Task Templates to Create Standard Tasks for a Group of Assets
Creating a Standard Task from Scratch
Generating Checksheets from Standard Tasks
Linking a Standard Task to an SAP Maintenance Item or Task List
Using Asset or Site Status to Control Standard Task Triggers
Entering Planning Information for a Standard Task
Changing the Planner for Standard Tasks
Adding Trades to a Standard Task
Adding Materials and Tools to a Standard Task
Adding Services to a Standard Task
Adding Holds to a Standard Task
Setting up a Dynamic Inspection Route on a Standard Task
Adding Static Indicators to a Standard Task
Setting Inspection Options for a Standard Task
Setting Mobile Computing Options on a Standard Task
Adding Standard Documents to a Standard Task
Working with Standard Tasks
Working with Standard Task Due Dates
Working With Indicator Collection Audit Reports
Changing the Order of Indicators on a Standard Task
Linking a Standard Task to Action Plans
Editing a Standard Task
Editing a Standard Task that is Based on a Template
Copying a Standard Task
Setting up Task Templates
Creating a Task Template
Linking a Task Template to an SAP General Task List
Entering Planning Information for a Task Template
Adding Trades to a Task Template
Adding Materials and Tools to a Task Template
Adding Services to a Task Template
Adding Holds to a Task Template
Adding Indicator Templates to a Task Template
Setting Mobile Computing Options on a Task Template
Adding Standard Documents to a Task Template
Using Asset or Site Status on a Template to Prevent Task Triggers
Editing a Task Template
Using Task Templates
Viewing Standard Tasks Created From Task Templates
Viewing Audit History for a Standard Task
Reviewing Changes Applied to a Standard Task from a Task Template
Reviewing and Removing Overrides on a Standard Task
Removing the Link Between a Standard Task and Template
Changing the Link Between a Task Template and a Standard Task
Setting up Standard Jobs
Creating a Standard Job from a Template
Creating a Standard Job from Scratch
Creating a Seasonal Standard Job
Creating a Preventive Maintenance Route
Adding Standard Tasks to a Standard Job or a PM Route
Changing the Order of Standard Tasks on a Standard Job or a PM Route
Creating Scheduling Dependencies for Tasks on a Standard Job
Viewing Task Dependencies for a Standard Job
Creating Triggering Rules for a Standard Job or PM Route
Triggering a Subset of Standard Tasks on a Standard Job or PM Route
Setting Options and Work Order Rules for a Standard Job
Automatically Scheduling Standard Jobs
Editing a Standard Job
Copying a Standard Job
Viewing Audit History for a Standard Job
Checking the Triggering Status of a Standard Job or PM Route
Reviewing PM Generation Errors
Setting up Job Templates
Creating a Job Template
Adding Task Templates to a Job Template
Changing the Order of Task Templates on a Job Template
Setting Options and Work Order Rules for a Job Template
Setting up Triggering Cycles on a Job Template
Editing a Job Template
Triggering Rules and Cycles
Work Triggers
Creating an Exception Triggering Rule
Creating a Time-based Rule Clause
Creating an Indicator-based Rule Clause
Using Early Warning Trigger Clauses
Adding an Early Warning Clause to a Triggering Rule
Resetting Work Triggers on an Asset
Standard Documents
Creating a Standard Document
Editing a Standard Document
Printing a Standard Document
Viewing Standard Documents
Safety Management
Introduction to Safety Management
Overview of Safety Management
Glossary of Safety Management Terms
Creating Safety Management Objects
Creating a Safety Provision
Adding a Process Parameter to a Provision Version
Defining a Safety Override on a Provision
Creating an Override Incident
Working with Safety Management Objects
Requesting Follow-up Work for an Override Incident
Sending a Safety Object for Approval
Marking a Safety Provision Draft as Accepted
Updating Status Using a Change Set
Viewing Information about Safety Objects
Construction Management
Overview of Construction Management
Introduction to Construction Management
Construction Management and AWEIS
Setting up APM for Construction Management
Glossary of Construction Management Terms
Working with Construction Forms
Creating Construction Forms
Validating Construction Forms
Creating and Updating Assets for Construction Forms
Creating a Gas Transaction from a Construction Form
Creating Asset Change Requests for Construction Forms
Creating Equipment Removal Requests
Generating Inspection Activities for Construction Forms
Reviewing Construction Activities
Regulated Gas Management
Introduction to Regulated Gas Management
Overview of Regulated Gas Management
Setting up APM for Regulated Gas Management
Maintaining Gas Containers
Creating Gas Containers
Changing a Gas Container’s Weights
Scales and Calibration for Gas Management
Creating Gas Transactions
Creating a Receipt Gas Transaction
Creating an Initial Fill Gas Transaction
Creating a Current Weight Gas Transaction
Creating an In-service Fill Gas Transaction
Creating a Gas Recovery Transaction
Creating an Adjustment Gas Transaction
Creating a Return Gas Transaction
Creating a Missing-from-Inventory Gas Transaction
Creating a Transfer Gas Transaction
Creating Gas Emergency Events
Marking a Gas Transaction as Incorrect
Work Management with AWEIS
Overview of Work Management with AWEIS
Creating a Request for Work from Scratch
Acknowledging Indicator Alarms with AWEIS
Creating a Request for Work from a Checksheet
Creating a Failure to Acknowledge an Alarm with AWEIS
Setting up Indicator States to Create Requests for Work
Setting up Solution Package Templates
Generating Checksheets for Interop Work Documents
Splitting Checksheets
Linking Checksheets and Interop Work Requests
Work Document Change Requests
Introduction to Work Document Change Requests
Creating a Work Document Change Request
Sending a Work Document Change Request for Approval
Anomaly Risk Assessment and Integration
Introduction to Anomaly Risk Assessment and Integration
Setting up APM for Anomaly Risk Assessment and Integration
Performing Risk Assessment when Acknowledging an Alarm
Performing Risk Assessment on a Request for Work
Working with Anomaly Events
Viewing a Failure’s Anomaly Events
Work Requests
Creating a Work Request
Sending Work Requests for Approval
Viewing Information About a Work Request
Linking a Work Request to a Work Order Task
Removing the Link Between a Work Request and a Work Order Task
Closing a Work Request
Canceling a Work Request
Reopening a Work Request
Deleting a Work Request
Viewing Request Information on a Work Order Task
Work Orders and Tasks
Work Management Overview
Work Management and Life Cycle
Work Documents
Work Types
Unplanned Work Order Policy
Approving Work Documents
Maintenance Miscellaneous Cost Transactions
Creating Work Orders and Tasks
Creating a Work Order from Scratch
Creating a Work Order Task from Scratch
Creating a Work Order from a Standard Job
Creating a Work Order Task from a Standard Task
Adding Tasks to a Work Order
Reviewing Upcoming Work
Changing the Number of a Work Order
Charging Work Costs to a Component’s Location
Copying a Work Order
Working with Work Orders
Checking Open Work and Warranties
Opening a Work Order
Opening a Work Order Task
Editing a Work Order or Task
Viewing Information About a Work Order
Entering and Editing Comments on a Work Order Task
Sending a Work Order for Approval
Releasing a Work Order for Approval
Viewing Requisitions and Purchase Orders for a Work Order
Viewing Checksheet Readings on Work Order Tasks
Viewing Indicator Snapshots on Work Order Tasks
Viewing Work Order Task Audit History
Printing Work Order and Task Reports
Planning Work
Entering Planning Information for a Work Order Task
Changing the Planned Completion Date
Changing the Planner on Work Order Tasks
Lag Time on Resource Demands
Adding Trades to a Work Order Task
Adding Job Contractors to a Work Order Task
Adding Services to a Work Order Task
Adding Warehouse Items to a Work Order Task
Adding Materials to be Purchased to a Work Order Task
Adding Tools to be Issued from a Warehouse to a Work Order Task
Adding Tool or Equipment Rentals to a Work Order Task
Adding Tool Purchase Requirements to a Work Order Task
Adding a List of Indicators to Read to a Work Order Task
Changing the Order of Indicators to Read on a Work Order Task
Adding Standard Documents to a Work Order Task
Installing, Removing, and Swapping Components
Changing the Order of Tasks on a Work Order
Scheduling Relationships
Task Scheduling Relationships
Creating Scheduling Relationships for Tasks
Viewing Predecessor and Successor Tasks
Changing the Status of Work Orders
Work Order Statuses
Marking a Work Order as Planned
Marking Work Order Tasks as Planned
Redrafting a Work Order
Redrafting a Work Order Task
Grouping Work Orders
Grouping Work Orders
Creating a Master Work Order
Viewing Grouped Work Orders
Closing a Work Order Group
Working with Resource Demands
Requesting an RFQ for a Purchased Resource
Creating Purchase Orders from a Work Order
Creating Pick Lists from a Work Order
Marking a Resource Demand as Closed
Holding Work Order Tasks
Work Order Task Holds
Placing a Hold on a Work Order Task
Releasing a Hold on a Work Order Task
Releasing All of a Work Order Task’s Holds
Releasing All Work Order Task Holds for a Site
Viewing a Work Order Task’s Holds
Viewing Work Order Task Holds for the Site
Scheduling Work
Scheduling a Work Order Task Using Availability Scheduling
Scheduling Work Order Tasks Using Simple Scheduling
Reporting Work Activity and Costs
Activity Reports
Reporting Work Activity for a Work Order Task
Reporting Activity by Work Order Number
Reporting Activity For Emergency Work
Creating a Checksheet for a Work Order Task
Completing a Timecard
Tracking Work Delays
Reversing a Timecard Transaction
Entering a Material Issue
Entering a Material Return
Entering a Tool Issue
Reporting Rental Equipment Usage
Entering a Service Acknowledgment Transaction
Creating a Miscellaneous Cost Transaction For a Work Order
Completing Component Swapping Information
Reporting Downtime Incidents
Requesting Follow-up Work for a Work Order Task
Reviewing Activity Reports
Reviewing Activity and Closing a Task
Deleting Activity Reports
Closing and Canceling Work Orders
Closing a Work Order Task
Closing a Work Order
Canceling a Work Order Task
Canceling a Work Order
Reopening a Work Order Task
Reopening a Work Order
Deleting a Work Order Task
Deleting a Work Order
Projects
Introduction to Project Management
Capital and Operational Project Management
Reliability Project Management
Setting up APM for Projects
Creating Projects
Creating a Capital or Operational Project
Creating a Reliability Project
Defining Estimated Cost, Project Life, and ROI
Setting up the Project Team
Adding Tasks to a Project
Defining the WBS Codes for a Project
Defining Project Justifications and Expected Benefits
Creating Work Orders and Tasks for Projects
Creating Work Requests for Projects
Using Projects to Track Analysis Requests
Sending Projects for Approval
Working With Projects
Viewing Information about Projects
Changing Project Status
Working With a Project’s Links to Maintenance Action Plans
Viewing Project Status Change History
Recording Benefits Achieved
Redrafting Projects
Viewing Revision History of Projects
Canceling and Deleting Projects
Work Schedules
Scheduling Concepts
Setting Up Scheduling
Using Simple Schedules
Creating Simple Schedules
Scheduling Multiple Work Order Tasks Using Simple Scheduling
Opening Simple Schedules
Removing Work Order Tasks from a Simple Schedule
Rescheduling a Task Using Simple Scheduling
Viewing Scheduled Tasks on Simple Schedules
Creating Schedule Templates
Creating a Schedule Template
Setting Schedule Template Properties
Using the Schedule Template Hierarchy
Creating a Set of Schedule Templates
Setting up Schedule Templates for a 28-Day (4-Week) Shift Rotation
Setting Availability on a Template
Opening a Schedule Template
Creating Availability Schedules
Creating a Schedule from Scratch
Setting Schedule Properties
Creating Schedules from a Template
Adding Child Schedules
Using the Schedule Hierarchy
Adding Tasks to Availability Schedules
Adding Tasks to an Availability Schedule
Adding a Task from the Work Backlog
Adding a Work Order from the Work Backlog
Adding a Task to a Schedule When You Know the Work Order Number
Adding Tasks to a Child Schedule
Scheduling a Task over Multiple Schedules
Task Splits and Scheduling Relationships
Working with Employee and Resource Availability
Calculating Availability for a Schedule
Editing Availability on a Schedule
Viewing Resource and Employee Availability on a Schedule
Moving Hours Between Employee Trades
Adding Employee Availability to a Schedule
Assigning Tasks to an Employee
Changing the Time Planned for a Tradesperson
Viewing a Trade's Scheduled Tasks
Viewing an Employee's Scheduled Tasks
Working with Availability Schedules
Opening an Availability Schedule
Using the Schedule Worksheet
Editing a Schedule Entry
Viewing Split Schedule Entries
Creating Relationships Between Schedule Entries
Viewing Schedule Entry Relationships
Rescheduling a Task
Removing a Task from an Availability Schedule
Entering Labor Charges on an Availability Schedule
Printing Work Packages For a Schedule
Printing Scheduled Work by Asset or Start Date
Viewing Schedules for Work Weeks
Locking, Expiring, and Deleting Schedules
Locking a Schedule
Unlocking a Schedule
Expiring a Schedule Manually
Expiring Schedules for a Site
Reopening a Schedule
Deleting a Schedule
Deleting Schedules for a Site
Exporting Schedules to Microsoft Project
Exporting Schedules to Microsoft Project
Setting MS Project Values on a Schedule Template
Setting MS Project Values on a Schedule
Creating an MS Project Template
Exporting Schedules to New Microsoft Project Files
Exporting Schedules to Existing Microsoft Project Files
Opening a Microsoft Project File From APM
Fine Tuning Schedules in Microsoft Project
Moving Tasks Within a Schedule in Microsoft Project
Importing Schedules From Microsoft Project
Adding Tasks to an Exported Schedule
Updating Actual Work Completion Status in Exported Schedules
Viewing Splits Created in MS Project
Clearing Links to Microsoft Project Files
Personnel Management
Employees
Adding an Employee
Selecting Roles and Permissions for an Employee
Setting Email Options for an Employee
Setting Task Comment and Hold Options for an Employee
Entering Timecards
Transferring an Employee
Trades
Adding a New Trade
Adding Labor Rates To Trades
Contractors
On-site Contractors
Procurement Process for On-site Contractors
Creating a Requisition for an On-site Contractor
Creating a Supplier Resource for an On-site Contractor
Creating a Purchase Order for an On-site Contractor
Adding an On-site Contract Employee
Selecting Contractors for a Supplier Resource Price
Creating an Invoice for an On-site Contractor
Job Contractors
Procurement Process for Job Contractors
Managing Maintenance Groups
Editing Maintenance Group Settings
Setting up the Maintenance Group Hierarchy
Changing the Planner Assigned to a Maintenance Group
Viewing Information For Maintenance Groups
Troubleshooters
Adding Troubleshooters
Creating a Standard Task for Troubleshooters
Creating a Troubleshooter Timesheet
Creating a Troubleshooter Timecard for an Asset
Viewing Follow-up Work Requests Created from Troubleshooter Timecards
Document Approvals
Overview of Document Approvals
The Approval Process
Setting up Document Approvals
Approvers
Approval Routes
Checksheet Approval on APM Remote
Approvers
Setting up an Employee as an Approver
Setting up an Approver for Notification Emails
Setting up Substitute Approvers
Deleting a Substitute Approver
Viewing Approval Routes for an Employee
Viewing Where an Employee is a Substitute Approver
Viewing an Approver’s Substitution History
Approval Routes
Creating Approval Routes
Setting up Automatic Approvals
Using Automatic Approvals with Standard Jobs
Adding Approvers to an Approval Route
Adding a GL Account to an Approval Route
Limiting Approval Routes to Specific Buyers
Selecting Invoice Types for an Approval Route
Adding Assets to Approval Routes
Selecting Work Types for an Approval Route
Adding Projects to Approval Routes
Viewing Approval Routes for a GL Account
Viewing Approval Routes for an Asset
Working With Document Approvals
Sending a Document for Approval
Approving a Document
Forwarding an Approval Request
Returning an Approval Request Without Approval
Bypassing Another Approver on an Approval Route
Redrafting a Document
Viewing Approval Requests
Viewing a Document’s Approval Status
Resources
Adding a New Material
Adding a New Tool
Adding a New Service
Overriding the Supplier Selection Rules on a Resource or Trade
Overriding RFQ Policies on a Resource or Trade
Creating a Parts List for a Resource
Removing a Resource From All Parts Lists
Linking Manufacturers to a Resource
Listing Alternates for a Resource
Linking an MSDS to a Resource
Reviewing Supplier Selection Rules on a Resource
Reviewing Price Tolerances for a Resource
Reviewing RFQ Requirement Rules on a Resource
Overriding the Invoice Price Tolerance Rules on a Resource or Trade
Reviewing Where a Resource is Used
Changing the Default Buyer for Resources
Procurement
Procurement Life Cycle
Procurement Transactions
Procurement and Materials
Using My Desk To Work With Purchase Demand
Assigning Demand to Buyers
Reviewing Demand
Viewing and Managing RFQs
Overriding Purchase Demands
Marking Demand as Reviewed
Creating Purchase Order Lines to Satisfy Demand
Adding Demand to an Existing Purchase Order
Suppliers
Suppliers, Supplier Resources, and Prices Overview
Creating Suppliers
Creating a Supplier
Creating a Supplier Hierarchy
Identifying a Payment Supplier
Changing a Supplier’s Purchase Type
Adding a Supplier’s Warranty
Adding Manufacturer References to a Supplier
Adding a Contact for a Supplier
Selecting Order Desk and RFQ Contacts for a Supplier
Adding Alternate Addresses to a Supplier Record
Selecting Resource Categories for a Supplier
Working With Suppliers
Editing Supplier Information
Adding Notes to a Supplier
Editing the List of Supplier Resources
Activating a Supplier
Inactivating a Supplier
Deleting a Supplier
Viewing Suppliers
Viewing Supplier Information From the Supplier Hierarchy
Viewing a Supplier’s Web Page
Viewing a Supplier’s Warranties
Viewing a Supplier’s Purchase Orders
Viewing Supplier Invoices
Viewing Suppliers By Resource Category
Viewing a Supplier’s Audit History
Viewing a Supplier’s Status Change History
Supplier Resources
Supplier Resources in a Multi-Site Environment
Supplier Resources
Creating a Supplier Resource
Creating a Supplier Resource Tax
Adding Extra Charges to a Supplier Resource
Entering Manufacturer Information for a Supplier Resource
Copying a Supplier Resource
Editing Supplier Resources
Resetting Taxes for Supplier Resources
Searching for Supplier Resources
Inactivating a Supplier Resource
Prices
Adding Prices to a Supplier Resource
Adding Extra Charges to a Supplier Resource Price
Resetting Current Prices for Supplier Resources
Entering Manufacturer Information for a Price
Viewing Prices for a Supplier Resource
Inactivating a Supplier Resource Price
Requisitions
Replenishing a Warehouse
Creating Manual Requisitions
Creating a Manual Replenishment Requisition
Work Order Requisitions
Adding Lines to a Requisition
Requesting a Quotation for a Purchase Requirement
Marking a Resource Demand as Closed
Marking Requisitions as Planned
Sending Requisitions for Approval
Redrafting Manual and Replenishment Requisitions
Turning a Requisition into a Purchase Order
Manually Closing Requisitions
Requests for Quotation (RFQs)
Requests for Quotation Overview
Creating RFQs
Creating “For Demand” Requests for Quotation
Creating a Catalog Prices RFQ
Completing RFQ Properties
Adding Resources to a Catalog Prices RFQ
Adding Resources to a For Demand RFQ
Splitting an RFQ Resource
Changing the Order of Resources on an RFQ
Releasing RFQ Resources for Approval
Changing the Ranking Method for a Resource
Adding Suppliers to an RFQ
Adding Notes to an RFQ
Deleting Suppliers from an RFQ
Sending RFQs to Suppliers
Sending an RFQ to All Suppliers
Changing the Status of an RFQ to Waiting for Bids
Redrafting an RFQ
Entering Bid Information
Entering Bid Information on an RFQ
Importing Bid Information From an Excel® Spreadsheet
Adding RFQ Resources to a Supplier’s Bid Sheet
Deleting Supplier Bids from an RFQ
Canceling an RFQ Resource Line
Adding Manufacturer Information to a Resource Bid
Recording Suppliers Who Decline to Bid
Analyzing Bids
Analyzing Bids to Find the Best Supplier For an RFQ
Analyzing Bids to Find the Best Supplier For Each Resource
Manually Setting Supplier Rankings
Manually Setting Supplier Rankings For a Resource
Pre-selecting Bids to Receive “Preferred Supplier” Status and for Alternate Pricing
Excluding a Supplier From an RFQ Analysis
Locking Supplier Resource Rankings on an RFQ
Awarding RFQs
Accepting RFQ Bids as Valid Prices
Awarding RFQs
Reopening an RFQ
Viewing RFQ Activity
Contracts
Contracts Overview
Creating a New Contract
Editing a Contract That Was Created From an RFQ
Adding Extra Charges to a Contract
Adding Supplier Resources to a Contract
Setting Expiry Notification Rules on a Contract
Adding Notes to a Contract
Copying a Contract
Sending Contracts for Approval
Editing a Contract
Creating a Purchase Order From a Contract
Creating a Blanket Order From a Contract
Checking for Expiring Contracts
Creating a New Pricing Agreement for a Contract
Creating an RFQ to Renew a Contract
Manually Expiring a Contract
Reopening a Contract
Viewing Contracts
Canceling a Contract
Purchase Orders
Creating Purchase Orders
Creating a Purchase Order
Adding Lines to a Purchase Order
Adding or Removing Default Taxes on a Purchase Order Line
Distributing Costs on a Purchase Order Line
Updating Pricing on a Purchase Order Line
Distributing Costs on a Purchase Order
Working with Purchase Demands
Canceling a Purchase Order Line
Opening a Purchase Order
Working With Purchase Orders
Sending Purchase Orders for Approval
Sending a Purchase Order to a Supplier
Redrafting a Purchase Order
Changing the Delivery Dates on Purchase Order Lines
Printing a Purchase Order
Receiving Purchase Orders and Blanket Releases
Printing a Receiving Report
Acknowledging a Service on a Purchase Order
Receiving a Single Purchase Order Line
Returning Materials to a Supplier
Viewing Purchase Orders
Blanket Orders
Blanket Orders and Releases
Creating a Blanket Order
Adding Lines to a Blanket Order
Changing the Status of a Blanket Order
Creating a Blanket Release
Printing a Blanket Release
Receiving a Single Blanket Release Line
Invoicing
Invoicing Overview
Creating Invoices
Entering an Invoice
Creating an Invoice from a Template
Entering Payment Details on an Invoice
Adding Regular Expense Lines to an Invoice
Adding Miscellaneous Expense Lines to an Invoice
Adding Extra Charge Lines to an Invoice
Adding Tax Lines to an Invoice
Using the Invoice Lines Entry Pad
Adding or Removing Default Taxes on an Invoice Line
Changing the Distribution on an Invoice Line
Prorating Extra Charges and Taxes on an Invoice
Creating an Invoice Template
Working With Invoices
Balancing an Invoice
Sending Invoice Lines for Approval
Sending Invoices and Credit Memos for Approval
Redrafting an Invoice Line
Redrafting an Invoice
Posting an Invoice
Holding Purchase Liabilities from Being Invoiced
Releasing Held Purchase Liabilities
Holding an Invoice From Posting or From Payment
Releasing a Hold on an Invoice
Recording Advance Payments
Recording Holdback Payments
Reversing an Invoice
Viewing Information about Invoices
Checking the Status of an Invoice
Viewing Financial System Entries for an Invoice
Viewing Payment Information for an Invoice
Credit Memos
Entering a Credit Memo
Adding Lines to a Credit Memo for Returned Items
Adding Unmatched Lines to a Credit Memo
Adding Price Adjustment Lines to a Credit Memo
Posting a Credit Memo
Invoice Batches
Creating an Invoice Entry Batch
Adding Invoices to a Batch
Balancing an Invoice Entry Batch
Editing the Batch Number on an Invoice
Editing the Totals on an Invoice Batch
Posting an Invoice Entry Batch
Reopening an Invoice Entry Batch
Manufacturers
Creating Manufacturer Records
Adding a Manufacturer’s Warranty
Viewing the Site’s Manufacturer Records
Inventory
Inventory
Warehouses and Warehouse Items
Working with Warehouses
Adding an Item to a Warehouse
Issuing Materials
Returning Materials
Receiving Purchased Materials
Viewing Inventory Balances for a Warehouse
Replenishing a Warehouse
Holding a Warehouse Item from Replenishment
Changing a Replenishment Hold on a Warehouse Item
Releasing a Replenishment Hold on a Warehouse Item
Transferring Materials Between Warehouses
Receiving Materials Transferred from Another Warehouse
Picking Parts for a Work Order or Requisition
Opening a Pick List
Creating a Count Sheet
Opening a Count Sheet
Entering and Processing Inventory Count Results
Reviewing and Posting Count Adjustments
Adjusting Inventory
Printing Storage Labels for a Warehouse Item
Printing Bin Labels for a Warehouse
Printing a Label for a Serialized Inventory Unit
Marking Warehouse Items as Inactive or Active
Viewing Inventory Balances for a Warehouse Inventory Group
Viewing Inventory Transactions
Viewing Invoice Adjustments
Creating a Miscellaneous Maintenance Cost Transaction
Inventory and Mobile Devices
Assigning Count Sheets to a Mobile Device
Checking the Status of Mobile Count Sheet Activities
Consignment Inventory
Consignment Inventory
Setting up Consignment Support for a Supplier and Resources
Setting up the Consigned Usage Not Invoiced Account
Defining a Consignment Agreement for a Supplier
Creating a Consignment Inventory Group for a Supplier
Linking a Consignment Inventory Group to an Existing Warehouse
Defining Consignment Resources and Prices for a Supplier
Setting the Consignment Inventory Group for a Warehouse Item
Replenishing Consignment Inventory Using Purchase Orders and Receipts
Replenishing Consignment Inventory Using Inventory Adjustments
Adjusting Consigned Inventory
Issuing Consigned Inventory
Returning Consigned Inventory
Transferring Consigned Inventory Between Warehouses
Canceling a Consignment Agreement for a Supplier
Viewing a Supplier’s Consignment Inventory
Repairable Spares
Repairable Spares
Setting up Repairable Spares
Setting up the Site to Support Serialized Resources
Setting up the GL Holding Account for Serialized Units
Setting up Serialized Inventory Unit Statuses for Repairable Spares
Setting up Unit Identification for Repairable Spares
Changing Serialized Inventory Status Definitions for Repairable Spares
Creating a Task Template for the Automatic Creation of Repair Work Orders
Setting the Default Holding Area Asset for Component Swaps
Setting Up Assets, Resources and Inventory Units for Repairable Spares
Setting Up New Resources in Inventory for Repairable Spares
Adjusting Inventory Balances for Non-serialized Resources
Linking Multiple Assets to Non-serialized Resources
Activating Serialized Inventory Support for Resources
Setting up Repair Cycle Automation
Creating Serialized Inventory Units for Resources
Creating a Supplier Resource for Repairs
Manually Adding Serialized Inventory Units
Linking Existing Assets to Units After a Resource is Serialized
Creating a Unit to Be Repaired
Matching an Asset’s Status to the Inventory Status
Linking Assets to Serialized Units From the Asset
Changing a Serialized Unit’s Linked Asset
Setting up Serialized Inventory Units Not Linked to Assets
Repairing Failed Units
Swapping a Repairable Spare
Adding a Replacement Serialized Unit to a Work Order
Issuing Serialized Units
Swapping a Serialized Inventory Unit on a Work Order
Verifying Serialized Unit Info When Closing a Work Order Task
Repairing Failed Units Using the Internal or On-site Repair Process
Moving a Serialized Unit to the Repair Shop
Reporting an Asset Status Change on a Repair Work Order Task
Closing a Repair Work Order Task
Returning Repaired Serialized Units for Inspection
Returning Serialized Inventory Units to Inventory
Repairing Failed Units Using the External or Off-site Repair Process
Adding a Purchase Requirement for Off-site Repair to a Repair Work Order
Creating Off-site Repair Requisitions
Creating Repair Purchase Orders From Scratch
Creating Shipping Transactions
Receiving Repaired Resource Units
Receiving Off-site Repairs for Inspection
Decommissioning and Recommissioning Spare Components
Decommissioning Serialized Resource Units
Recommissioning Serialized Resource Units
Purchasing and Receiving New Serialized Resources
Creating Replenishment Requisitions for Serialized Component Resources
Creating Purchase Orders for New Units of a Serialized Resource
Receiving New Serialized Resources
Working With Serialized Units in Inventory
Creating Warehouse Requisitions for Serialized Resources
Counting Serialized Resources
Adjusting Inventory for Serialized Resources
Adjusting Unit Costs for Serialized Resources
Adjusting the Inventory Value for Serialized Resources
Adding Serialized Units
Deleting Serialized Units
Changing Serialized Unit Statuses
Changing Serialized Unit Condition Statuses
Transferring Serialized Units Not Linked to Assets
Receiving Transferred Serialized Units That Are Not Linked to Assets
Removing Serialized Inventory Support for a Resource
Viewing Repairable Spares and Serialized Resources
Viewing Serialized Unit Information From an Asset
Viewing a Resource’s Serialized Units
Viewing Serialized Resource Unit Details
Viewing Serialized Resource Warehouse Balances
Viewing Repair Information for Serialized Resources
Viewing a Resource’s Assets
Tools
Tools Usage and Equipment Rental
Checklists for Setting up Serialized Tool Resources
Setting up the Site to Support Serialized Tools
Setting up the Offset Account for Tools Usage Transactions
Setting up Serialized Unit Statuses for Tools
Setting up Warehouses for Tools
Defining Unit Identification for Tools
Setting up Tools as Serialized Resources
Getting Ready to Convert Tool Assets and Resources to Serialized Inventory
Setting Up Tools as Resources in Inventory
Adjusting Tools Inventory Balances for Non-serialized Resources
Linking Assets to Non-serialized Resources
Converting a Tool Resource To Track Serialized Inventory
Creating Serialized Units for Existing Tool Resources
The Tool Usage Cycle
Defining a Usage Rate for a Tool
Creating Requisitions for Tool Resources
Planning Tool Work Order Requirements
Issuing Serialized Tool Resources
Returning Serialized Tools to Inventory
Reporting Tools Usage
Equipment Rentals
Creating Supplier Resources and Defining Rental Rates for Tool Rentals
Creating Requisitions for Tool Rentals
Creating an Equipment Rental Purchase Order
Receiving Rental Equipment
Returning Rental Equipment to Suppliers
Viewing Rental Equipment Costs
Adding Single Tools
Adding Found Assets as Serialized Units
Matching an Asset’s Status to the Unit Status
Linking Maintainable Assets to Serialized Tool Resources
Purchasing New Serialized Tools
Creating Replenishment Requisitions for Serialized Tool Resources
Creating Purchase Orders for New Tool Resource Units
Receiving New Serialized Resources
Working With Serialized Tools in Inventory
Counting Serialized Resources
Adjusting Inventory for Serialized Resources
Adding Serialized Units for Tools
Adjusting the Inventory Value for Serialized Units
Adjusting Unit Costs for Serialized Resources
Deleting Serialized Units
Changing Serialized Unit Statuses
Viewing Tools
Viewing a Tool’s Serialized Units
Viewing Serialized Tool Details
Viewing Warehouse Balances for Tools
Viewing Serialized Unit Information From a Tool Asset
Viewing Usage Information for Tools
Reports
Reports Overview
Creating a Custom Report
Creating a Subreport
Modifying Standard Reports
Linking a Subreport to a Main Report
Report Bands
Report Accessories
Adding Fields to a Report
Creating a Summary Field
Adding Prompts to Reports
Linking Subreports to a Single Prompted Filter
Removing Text from Multi-part Fields
Creating a Report Category
Mobile Devices and Activities
Overview of Mobile Computing
Working with Mobile Computers in APM
Assigning Activities to a Mobile Device
Canceling and Un-canceling Mobile Computing Activities
Closing and Reopening Mobile Computing Activities
Manually Processing Uploaded Activities
Marking Mobile Devices as Inactive or Active
Implementation Guide
Overview
Asset Reliability Process
Steps Involved in Implementing APM
Initial APM Settings
How to Use the Topics in this Section
About Settings and Value Lists
UTC, Enterprise Time, and Site Time Zones
Importing Time Zone Information
Launching APM, Selecting a Time Zone, and Creating Users
Setting up the Enterprise and Sites
Overview of the Enterprise and Sites
Sites and Hierarchies
Sharing and Partitioning Data Between Sites
Deciding How Many Sites to Use
Site Types and Site Ownership of New Objects
Site Hierarchy Queries
**Setting Enterprise Properties
Setting up Regions, Site Categories, and Site Groups
**Setting up Site Types
Status name
Site Currencies in the Enterprise
Editing Properties for the Top Site
Setting up a Site Hierarchy
Changing a Site’s Time Zone
Setting up Site Value Lists
Working with Site Settings
Viewing Enterprise Audit History
Viewing Site Audit History
Foundation Settings
**Asset Hierarchy Settings
**International Settings
**Setting up Countries
**Setting up States and Provinces
Setting up Localities
Adding Currencies
Adding UOM Categories
Adding Units of Measure
Setting up Financial Periods
Setting up Welcome Messages
Setting up the Maximum Size for Images
Changing User Interface (UI) Settings
**Accounting Settings
Site Accounting
Viewing Site Accounting Settings
Currency Exchange Rates
Setting up Currency Combinations and Exchange Rates
Adding Currency Exchange Rates
Editing Current Exchange Rates
Deleting Exchange Rates
Self-Assessed Taxes and Extra Charges
**Setting up Cost Types
**Setting up GL Account Derivation Rules
**Setting up GL Accounts
Inactivating and Activating GL Accounts
**Setting Site Accounting Policies
**Setting Cost Types for a Site
Selecting Site and Special Accounts
Setting up Late Charge Rules
Setting up Taxes
Selecting a Locality and Default Taxes for a Site
Setting up Labor Rate Types
Setting up UI Types
Setting up Multi-Language Data
Maintenance Settings
Using the Implementation Assistants
**Asset Management Settings
Asset Classifications
**Setting up Asset Types
Setting Strategy Development Options on Asset Types
Asset Types for Electricity Transmission and Distribution Networks
**Setting up Asset Statuses
Setting up Reasons for Changing Asset Status
Selecting Default Statuses for Components and Locations
Setting up Asset Areas
Setting up Function Groups
Setting up Asset Integrity Groups
Setting up Asset Categories
Setting up Asset Classes
Setting up Asset Operating Conditions
Setting up Asset Note Types
Setting up Asset Change Request Types
Setting up Asset Change Request Statuses
Setting up Change Request Events: Rules for Assigning Statuses
Setting up Asset Dispositions
Setting up Asset Change Request Templates
Setting up Regulatory Reporting
Creating Manufacturer Records
Selecting a Holding Area Asset
Setting up Asset Age Calculations
Setting up Circuit Types
Adding Values for Asset Subtypes and Specifications
Working with User Asset Specifications
Setting up Environment Toxicity Values
Setting up Structural Minimum Thickness Lookup Tables
Setting up Characteristic Mapping for Assets
Setting up Characteristic Mapping for Asset Change Requests
Asset Activity Report Settings
Setting up Asset Activity Report Section Types
Setting up Statuses for Asset Activity Reports
Setting up Asset Activity Report Types
Setting up Asset Activity Report Numbers
Copying Asset Activity Report Types and Sections
Setting up Asset Activity Report Groups and Classifications
Strategy Development Settings
Creating Change Sets
Setting up Analysis Types
Setting Failure Mode Options for Analysis Types
Setting Risk Analysis Options for Analysis Types
Setting up Study Types
Setting up Study Statuses
Setting up Study Step Types
Setting up Operating Contexts
Setting up Checklist Items for Strategy Development Analysis
Setting Smart Mapping Defaults for Failure Mode Copying
Setting Smart Mapping Options for Failure Mode Copying
Setting the Numbering Format for Analyses, Failure Modes, and Unwanted Situations
Damage Mechanism Settings
Setting up Degradation Patterns
Setting up Degradation Mechanisms
Setting up Degradation Types
Setting up Inspection Locations
Setting up Degradation Categories
Setting up Degradation Scopes
Setting up Temperature Ranges
Setting up Processes
Setting up Flows
Setting up Load Types
Setting up Failure Mode Credibility Values
Setting up Failure Mode Hole Sizes
Setting up Usage Groups
Failure Mode Settings
Setting up Action Plan Task Statuses
Setting up Modification Types
Setting up Material Types and Classifications
Setting up Barriers
Setting up Technologies
Setting up Evaluation Groups
Setting up MEI Override Reasons
Setting up Symptoms
Setting up Duty Codes
Setting up Severity of Usage Values
Setting up Task Effectiveness Values
Setting Failure Mode Filtering Options
Setting Options for CMMS Tasks
Setting the Numbering Format for Failure Modes
Setting up FM Failures
Setting up FM Causes
Failure Probability Settings
Setting up Failure Probabilities
Setting up Probability Evaluation Score Sets
Setting up Probability of Failure Questionnaires
Setting up Probability of Failure Evaluations to use Lookup Tables
Setting up Susceptibility to Failure Questionnaires
Setting up Likelihood of Failure Values
Setting up Demand Rates
Setting up Demand Scenarios
Setting up a Probability Matrix
Setting up Detectability Values
Consequence Severity Settings
Setting up Severities
Customizing Criticality Terminology
Setting up Severity Evaluation Score Sets
Setting up Health and Safety Evaluations
Setting up Environmental Evaluations
Setting up Reputation Evaluations
Setting up Evaluations with the Category Answer Matrix
Setting up RBI Lookup Tables and Sets
Setting up Consequence Severity Evaluations to use Lookup Tables
Setting up Injury Severities
Risk Analysis Settings
Setting up Risk Matrices
Setting up Failure Mode Criticalities
Setting up Consequence Priorities
Setting up Risk Plot Lines and Areas
Confidence Evaluation Settings
Setting up Confidence Questionnaires
Setting up Confidence Evaluation Forms
Setting up Degradation Types
Setting up Inspection Strategies
Setting up Confidence Factors
Setting up Inspection Factors
Setting up Lining Conditions
Asset Prioritization Settings
Suggested Failure Consequences
Consequence Priority Concepts and Examples
Setting up Analysis Types for Asset Prioritization
Setting up Criteria for Prioritization Analysis
Defining Improvement Opportunities
Setting up Failure Probabilities
Setting up Probability of Failure Criteria
Setting up a Probability of Failure Criteria Matrix
Setting up Consequence Priorities
Setting up Prioritization Analysis Rule Sets
Setting up Checklist Items
Reliability Strategy Settings
Setting up Statuses for RSS Analyses
Setting up Checklist Items
Setting up RSS Events: Rules for Assigning Statuses
Setting Relative Risk and Asset Priority Thresholds
Setting the Numbering Format for RSS Analyses
**Inspection Management Settings
**Indicator Settings
Indicator Value Types
Alarm Notification
**Setting up Indicator Types
Setting up Alarm Types and Notification Ranking
Setting Acknowledgment Policies
Setting up Technologies
Enforcing Barcode Scanning on Mobile Devices
Setting up Collection Groups for Dynamic Routes
Setting up Collection Sets for Dynamic Routes
Setting up Survey Types
Setting up Inspector Severities
Setting up Recommended Actions
Setting Policies for Indicator Readings
Setting the Inspection Photograph Maximum Size
Setting up Conditional Indicator Lists
Setting Options for Incorrect Indicator Readings
Setting Indicator Degradation Options for Sites
Setting up Inspection Effectiveness Tracking
Setting the Default Action when Browsing for Indicators
Setting the Default Value for Default to Normal on Descriptive Indicators
Setting Acknowledgment Defaults for New Alarm States
Setting Indicator Lubrication Options
Setting up Inspection Analytics Settings
Setting up Chart Target Lines
Enabling Next Due Date Information
Adding Values for Indicator Subtypes
ODC Indicator Settings
Configuring Data Sources for OPC Plugins
Configuring a Data Source for the PI Plugin
Configuring Data Sources for the DB Plugin
Creating Polling Schedules
Checksheet Settings
Setting Checksheet Options
Setting up Inspection Activity Types
Setting up Inspection Activity Sign-off Statuses
Setting up Checksheet Types
Setting up Checksheet Statuses
Controlling Checksheet Download and Export Using Checksheet Settings
Setting up Checksheet Generation Options
Setting up Calibration Templates
Setting up Inspection Document Types and Classes
Setting Checksheet Export Options
Setting Checksheet Default Text
Inspection Report Settings
Setting up Inspection Report Statuses
Setting up Inspection Report Types
Setting Inspection Report Default Text
Setting the Numbering Format for Inspection Reports
Fluid Condition Settings
Setting up Fluid Types
Setting up Fluid Sample Tests
Setting up Fluid Sample Types of Test
Setting up Oil Preservation System Types
Setting up Gas Standards
Setting up Settings for Lab Fluid Samples
Setting up Fluid Analysis Labs
Setting up Sample Types and Statuses
Setting up Fluid Contaminants
Setting Label Defaults for the Site
Setting the Numbering Format for Fluid Samples
Asset Health Monitoring Settings
Assigning Asset Health Policies
Setting up Report Statuses and Event Rules
Creating an Asset Health Calculation Condition
Setting up Report Types, Groups, and Classifications
Setting up Calculation Groups and Classifications
Asset Condition and Restoration Settings
Asset Condition Analysis Settings
Setting up Analysis Types for Asset Condition Analysis
Setting up Criteria for Condition Analysis
Setting up Asset Conditions
Setting up Priority and Condition Groups
Setting up the Priority and Condition Matrix
Setting up Asset Condition Analysis Rule Sets
Setting up Checklist Items for Condition Analysis
Asset Restoration Plan Settings
Setting up Asset Restoration Plan Statuses
Setting up Restoration Plan Asset Statuses
Setting up Asset Restoration Plan Types
Setting up Expense Types for Spending Plans
Setting the Numbering Format for Restoration Plans
**Reliability Program Settings
**Setting up Work Types
Setting up Work Classifications
Setting up Work Priorities
Setting up Frequencies
Setting up Shutdown Types
Setting up Problem Categories
Setting up Causes
Setting up Remedies
Setting up Solution Package Types
Setting up Planner Groups
Setting up Document Types
Setting the Indicator Projections Rule for PM Triggering
Setting up the Policy for Recording PM Generation Errors
Setting the Policy for Copying Standard Tasks and Jobs
Setting Default Values for Inspection Routes
Setting the Numbering Format for Standard Tasks, Jobs, and Solution Package Templates
Performance Management Settings
Defining Failure or Anomaly Types and Classifications
Defining Failure Severities
Defining Statuses for Failure Follow-up Actions
Defining Mitigation Types
Setting the Failure and Downtime Filtering Horizons
Setting Options for Charting Indicator Readings for Failures
Setting the Numbering Format for Failures
Setting up Downtime and Work Delay Reasons
Setting up Products for Production Loss Accounting
Selecting a Default Time Unit for Downtime
Allowing Overlapping Downtime Incidents
Selecting the RCA Diagram Template
Setting up RCA Recommendation Thresholds
Setting up RCA Analysis Types
Setting up RCA Analysis Statuses
Setting up Failure Severities for RCA
Setting up Probability of Recurrence Values for RCA
Setting up Cause Classifications for RCA
Setting up RCA Checklist Items
Setting up RCA Events: Rules for Assigning Statuses
Setting the Numbering Format for RCA Analyses
Safety Management Settings
Safety Statuses and Types
Setting up Safety Statuses
Setting up Safety Types
Setting up Safety Classifications
Setting up Safety Categories
Setting up Safety Risk Levels
Setting up Safety Integrity Levels
Setting up Safety Provision Levels
Setting up Inspection Regimes
Setting up Safety Impact Values
Setting up Override Approaches
Setting up Override Conditions
Setting up Override Methods
Setting up Extension Reasons for Override Incidents
Setting up HAZOP Checklist Items
Setting up Safety Management Options
Construction Management Settings
Setting up Statuses for Construction Forms
Setting up Automatic Status Assignments for Construction Forms
Setting up Serial Number Search Profiles
Setting up Construction Form Templates
Setting up Construction Form Defaults and Numbering
Viewing and Setting Asset Program Profile Dates
Setting up Manufacturer Rules for Construction Forms
Regulated Gas Settings
Setting up Gas Types
Setting up Gas Container Types
Setting up Gas Vendors
Setting up Gas Transaction Types
Setting up Gas Recovery Types
Setting up Gas Emergency Event Types
Setting up Reasons for Incorrect Gas Transactions
Work Management Settings
Unplanned Work Policy
Setting Activity Reporting Options
Setting the Policy for Start Date Prompting
Setting Work Package Printing Options
Setting Work Order Close Options
Setting up Work Order Hold Reasons
Setting up Work Completion Statuses
Setting up Date Change Reasons
Setting up Reasons for Canceling Work
Setting the Option for Work Request Titles
Setting Numbering Formats for Work Documents
Work Management Settings for AWEIS
Setting up Site-Specific Work Types
Setting Default Work Types
Setting up Work Statuses
Setting up Secondary Status Codes and Groups
Setting up Object Parts, Groups, and Related Codes
Setting up Task Types and Groups
Setting up Characteristic Mapping for Interop Work Documents
Setting up Failure Codes
Setting up Follow-up Work Creation Settings
Setting up Work Document Change Request Types
Setting up Work Document Change Request Statuses
Defining Change Request Creation Settings
Anomaly Risk Assessment Settings
Enabling Alarm Acknowledgment Risk Assessment
Setting up Criticalities for Anomaly Risk Assessment
Setting up Anomaly Event Statuses
Setting up Anomaly Risk Assessment Profiles
Setting up Anomaly Risk Assessment Results
Reminder Settings
Setting up Reminder Types
Setting up Reminder Statuses
Setting up Reminder Priorities
Setting up Reminder Object Types
Project Management Settings
Setting up Project Types
Setting up Project Classifications
Setting up Project Statuses
Setting up Assignment Types
Setting up Project Settings Profiles
Setting up Project Tasks and Task Statuses
Setting up Work Breakdown Structures
Setting up Events: Rules for Assigning Project Statuses
Setting up Project Approvals
Setting up Project Cost Calculation
Personnel Management Settings
Setting up Maintenance Groups
Setting up the Organizational Chart
Setting up My Desk Views
Setting up User-Defined Fields for Employees and Maintenance Groups
Labor Management Settings
Setting up Timecard Rules
Setting up Shifts
Setting up Work Delay Reasons
Scheduling Settings
Setting up Scheduling Priorities
Setting up Types of Schedules
Setting up Scheduling Periods
Setting Up Work Weeks
Setting up Schedulers
Schedule Template Properties
Schedule Properties
Setting up Schedule Numbers
Approvals Settings
Approving Documents
Setting up Approvals for Asset Management
Setting up Approvals for Strategy Development Analyses
Setting up Approvals for Inspection Management
Setting up Approvals for Work Management
Setting up Approvals for Projects
Setting up Approvals for Safety Management
Setting up Purchasing Approvals
Setting up Invoicing and Credit Memo Approvals
Setting the Request Originator Rule
Selecting Default Approval Routes for a Site
Creating Sets of Default Approval Routes
Resource Settings
Inventory Accounts
**Setting up Resource Categories
**Setting up Inventory Groups
**Setting up Warehouses
Setting up ABC Classifications
Setting up Inventory Criticalities
Setting up Replenishment Hold Reasons
Setting up Pick Methods
Setting up Count Groups
Setting up Serialized Inventory Unit Statuses for Repairable Spares
Setting Receiving Report Policies
**Setting up Material Adjustment Reasons
Setting up Material Return Reasons
Procurement Settings
**Requisition Management Settings
Setting Options for Requisitions
**Setting up Buyer Policies
**Defining Supplier Selection Rules
**Purchase Management Settings
Purchase Order Creation Rules
**Setting up Policies for Adding Demand to Purchase Orders
Setting up Purchasing Delivery and Expediting Rules
**Setting Options for Printing, Emailing, and Faxing Purchase Orders
Setting up Extra Charges
Setting up FOB Points
Setting up Freight Terms
Setting up Payment Terms
Setting up Purchasing Priorities
Setting up Shipping Modes
Setting Numbering Formats for Purchasing Documents
Supplier Management Settings
Defining the Reasons for Changing Supplier Status
Defining Supplier Address Types
Setting up Contract Types
**RFQ Management Settings
**Setting RFQ Policies
Setting the Default Duration for RFQs
**Setting up RFQ Forms, Faxing, and Email Defaults
Setting up RFQ Classifications
**Invoice Management Settings
Financial System Entries
**Enabling Purchase Liability Creation and Setting Invoicing Policies
Setting up Price Tolerances for Invoices
Setting the Automatic Balancing Threshold for Invoices
Setting up Invoice Types
Setting up Invoice Hold Reasons
Setting up Extra Charges for Service Acknowledgments
Configuring the APM Environment
APM Users
Creating an APM User ID
Linking an Employee to a User ID
Changing the Language for the APM Server
Setting up Employee Permission Groups
Setting up APM for AWEIS
Preparing APM Data for Interoperability
Setting up Site Integration Between APM and CMMS Instances
Setting up AssetWise Interoperability Systems
Setting up Site Interoperability Profiles for AWEIS
Defining Properties to Display on Interop Work Documents
Activating AssetWise Enterprise Interoperability in APM
Setting Defaults for Characteristic Mapping
Setting up APM Outbound Events
Setting up APM for Sites Created by AWEIS
APM Workflows
Overview of APM Workflows
Assigning Roles to APM Users
Creating User Roles
Activating APM Workflows
Security
Introduction to Security Profiles
Creating Security Profiles
Creating a Security Profile
Applying Composite Profile Security Settings
Viewing Users of Security Profiles
Using Security Setup Mode
Effects of Mark as Options for Views, Tabs, and Tables
Securing Views, Tabs, and Dialogs
Securing Table Configurations
Securing Table Columns
Security for Table Buttons
Securing Classes
Securing Actions
Securing Data
Securing Reports
Previewing a Security Profile
Copying a Security Profile
Editing Security Profiles Manually
Restricting Access to Enterprise
Attachment Security
Enabled Actions on Read-only Classes
Enabled Table Configuration Actions
Security Profile Examples
Creating an Editable (Full) Profile: Administrator Example
Creating a Read-only Profile: Data Collector Example
Site Security Setup
User Default Profiles
Site Profiles
Example Multi-site Setup
Managing Users and Security Profiles
Selecting Security Profiles for Users
Strategies for Testing Security Profiles and Settings
Scheduling Actions
Creating a Scheduled Action
Actions That Can Be Scheduled
Defining Recurrence Patterns
Suspending a Scheduled Action
Re-activating a Scheduled Action
Viewing Action Scheduler History
Setting up an APM Fax Server
Integration Feature for Purchasing and Materials Systems
Administration Guide
Logging on as an Administrator
Application Modules and License Keys
Overview of Application Modules
Enabling and Disabling Application Modules on Sites
Upgrading Sites to the Enterprise Asset Management Module
Manually Binding an Activation Key to the APM Database
Features Management
Product Usage Tracking
Indicator Mass Update Wizard
Overview of the Mass Indicator Update Wizard
Using the Indicator Mass Update Wizard
Viewing Indicator Mass Update Requests
Troubleshooting Indicator Mass Update Requests
Data Loading
Introduction to Data Loading
Setting up APM for Data Loading
Creating Import Templates
Assets
Importing Assets
Importing Asset Hierarchy Information
Resequencing Assets in a Hierarchy
Importing Asset Documents
Importing Asset CMMS Information
Strategy Development
Importing Maintenance Task Analyses
Importing MTA2 Templates
Importing RCM2 Analyses
Importing RBI Analyses
Importing Current Practice Reviews
Importing Maintenance Action Plan Indicators
Importing Maintenance Action Plan Critical Parts
Importing Maintenance Action Plan Inspection Tasks
Importing Maintenance Action Plan Corrective Tasks
Inspection Management
Importing Indicators
Importing Indicator Readings
Importing Indicator Initial Values
Importing Indicator Templates
Importing Indicator Measurement Point Readings
Importing Standard Task Due Dates
Importing Indicator Due Dates
Importing Solution Package Tasks
Degradation
Importing Asset Degradation Rates
Importing Indicator Degradation Rates
Reliability Program
Importing Standard Tasks
Importing Standard Task Indicators
Importing Standard Task Solution Packages
Performance
Importing Failure Events
Production
Importing Production Loss Events
Work Management
Importing Work Order Tasks
Resource Transactions
Importing Miscellaneous Cost Transactions
Personnel
Importing Employees
Importing Users
Importing User Site Security Profiles
Characteristics
Importing Asset Characteristics Values
Importing Asset Characteristics using Pivoted Values
Working with Process Jobs
Creating Process Batches
Viewing Import History
Data Purging
Introduction to Data Purging
Selection Criteria Concepts for Purging Rules
Specifying Data Purging Settings
Creating Purging Rules
Defining Selection Criteria for a Purging Rule
Creating a Filter Criterion Based on an Attribute
Creating a Filter Criterion Based on a Relationship
Working With Selection Criteria
Previewing a Purging Rule
Activating and Suspending Purging Rules
Manually Executing a Purging Rule
Setting Up Scheduling for Purging Rules
Viewing a Purging Rule’s History and Audit Files
List of Updated Objects
Asset Hierarchy Corrections
Correcting Multiple Hierarchy Errors
Correcting the Most Recent Swap
Correcting a Previous Swap
Viewing Hierarchy Corrections
Technical Details
Troubleshooting
Troubleshooting Derived GL Accounts
Approval Request Didn’t Send a Notification Email
Generating Cache Files
Adding Hints to a Table Configuration
Tables Do Not Show Complete Lists of Objects
Remote Computer is Locked by Temporary Service Provider
Customization Guide
Object Model Basics
Object Model Overview
Navigating the Customization Center and ObjectQuest Windows
Object Model Diagram Overview
Exploring the Object Model Using an Object Model Diagram
Exploring the Object Model Through the User Interface
Customization Concepts
Customization Overview
Planning Your Customization Requirements
Object Model Customization
Subtypes
User Interface Customization
Custom Indexes in APM
Customization Glossary
Customizing the Object Model
Adding an Attribute
Adding a Relationship
Creating Deletion Rules for Relationships
Creating an Enumerated List
Adding a New Custom Class
Enabling Auditing for a Custom Class
Viewing Auditing Information for Classes
Setting the Join Path to Site
Viewing Data Members
Creating Custom Validation Rules for Attributes
Creating Custom Validation Rules for Relationships
Creating Custom Messages
Customizing Approval Request Emails
Creating Custom States
Creating Asset Subtypes
Creating Failure Subtypes
Creating Indicator Subtypes
Customizing Indicator Subtypes
Customizing the User Interface (UI)
Creating a View
Editing an APM View or Panel
Copying an APM View or Panel
Adding a View to Site
Setting the Default View For an Object
Adding a Table Configuration to a View
Customizing Work Order Tasks, Standard Tasks, and Activity Reports
Customizing the Font Used in Text Fields
Creating Graphic Push Buttons
Creating Localized UI Text
Setting up Calculations
Creating Global Variables
Creating a Calculation Condition
Setting up Calculation Groups and Classifications
Defining Calculation Options
Calculations
Creating a Triggered Calculation Record
Creating an Asset Degradation Calculation Record
Creating a Degradation Minimum Value Calculation
Defining the Calculation
Using Logical Operators in Calculations
Creating a Calculation State
Assigning Triggering to a Calculation
Assigning a Gauge to Calculation Results
Creating Calculation Variables
Creating a Calculation Type Variable
Creating a Filter Type Variable
Creating a Global Variable Type Variable
Creating a Join Path Type Variable
Defining a Factor Table for a Variable
Assigning Calculation Variable Limits and Weighting
Assigning a Calculation Variable Null Value Behavior
Evaluating a Calculation
Triggering a Test Calculation
Defining Map Layers
Customizing UI Controls from the User Interface
Menus, Toolbars, and Banners
Menus, Toolbars, and Banners Overview
Customizing Menus
Customizing Toolbars
Customizing Banners
Customization Reference
Reference
Relationship Types
Data Types
Methods
Customization FAQ
40181365_Work_management_Int.html
Parent cost type
1000032275_Mark_as_Inactive_Act.html
Period Number
Title
Title
Stores material costs
Title
Resource
Security Profile to Use
Description
Unit
Currency
Resource
State or Province
Warranty Supplier
Hierarchy Name
1000032805_Change_Site_Status.html
**Currency
GL Account
Date Scheduled to Work
Component or Location
Delay Length
Prompt the remaining hours to work with 0 hours
Employees
Name
Title
Approves All Requests
Document ID
Effective Until
Document ID
Primary or Alternate
1000033387_Employee_skill_detai.html
Invoice
Title
Release Number
Completed Tasks
Title
Unit
Release Number
Release Number
Purchase order
Number
Quick search
Quick search
1000033727_Activate_Serialized_.html
Resource
1000033836_Services.html
1st Criterion
Title
RFQ is required for purchases when
1000034005_Inventory.html
1000034084_Reset_Date_and_Time.html
Asset to work on
Maintenance group
Street or Office/area
Effective Until
Demand Description
Check Price Increases
Demand Description
Demand Description
Mobile computer
Synchronized on
1000035407_Download_configurati.html
Package type
Synchronized on
1000035457_Data_Management.html
1000035459_Change_Polling_Inter.html
1000035460_View_SQL.html
Attribute to use for filtering
Resource
Unit
Release Number
Unit
Class of objects to purge
Total available
Current exchange rate
Hierarchy Name
Currency
Title
Demand Description
Site executed for
Release Number
Release Number
Value
Transaction type
Transaction type
1000035802_Change_SAP_Notificat.html
Event type
Sites
Show all
Asset
Option
Title
Asset
Cost type
Recurrence pattern
Rule title
Class of objects to purge
Next
Description
X coordinate
Warranty Supplier
Number
Site account segment for inventory GL account derivation
Account to use for consignment usage that has not been invoiced
1040022150_Scheduled_action_tri.html
MTA2 templates
Negative adjustment
1040022806_Asset_prioritization.html
Remaining PF interval
Usage
Only map assets that are at the same level of the hierarchy
To
Full message
Full message
Message type
Status
Receiving rentals
Asset documents
Number
Title
1040025084_Personnel_management.html
Site
Time card grouping
First part of the account
Keep an audit report of purge failures
Stocked in inventory
Name
Status of Removed Component
Sent for approval
Create a work order
1040029597_Browse_Enterprise_Lo.html
Band or range color
1040031404_Remote_computing_Ma.html
Number
KPI 1
Number
Alias
1040035279_Value_list_Resource.html
1040035301_Value_list_Default_.html
1040035315_Value_list_Inventor.html
Maintenance Group
Work Order Task
Release Number
Parent category
Override Cost Type
Override Cost Type
Comment Has Been Read
Unit of Measure
Title
P.O. line
Title
Description
Ordering UOM
Unit of Measure
Contractor
Version
Voucher numbers are automatically assigned
Description
Purchase Demand - FOB Point Rule
Subject
Override cost type
Title
Title
Requirement
Comments
Next Number
To
Asset health reports
Name
Name
Show failure modes template for:
Next Number
Prompt the remaining hours to work with 0 hours
Medium decreases
Title
Quick search
Override Cost Type
Second
KPI 1
1040062061_Dashboard_1_dashboa.html
1040062066_Dashboard_2_dashboa.html
Third dashboard
Third dashboard
1040062081_Dashboard_5_dashboa.html
Set type
Second dashboard
Number
Purpose
Model
Year of Manufacture
KPI 1
AHI 1
1040069455_Layout_illustrations.html
Currency
Description
1040070434_CMMS_integration_set.html
CMMS task status
**Type
RCA is required if the criticality index is or above
Warning message
Overlapping downtime incidents are allowed
Sent for approval
To
Instance description
Next Number
1040083721_Current_question_and.html
1040086082_Failure_finding_inte.html
Function
1040086961_History.html
1040088114_Invoice_price_tolera.html
1040088118_Repair_orders_RFQ_po.html
1040088122_Equipment_rentals_RF.html
1040088128_Service_orders_RFQ_p.html
1040088133_Regular_orders_RFQ_p.html
1040088142_Regular_orders_suppl.html
1040088148_Service_orders_suppl.html
1040088152_Repair_orders_suppli.html
1040088156_Equipment_rentals_su.html
Relative risk threshold
Date and Time Request Initiated
Text of the Document
Version
Version
Version
Title
Purchase Demand - FOB Point Rule
Effective Price Rule
Record standard job triggering errors
1040107728_Single_employee_appr.html
Number of employees required to approve a request
Response
1040108029_Application_note_Re.html
Reviewed by
1040108234_Safety_management_se.html
Next Number
System version
1040110713_Integration_Settings.html
Comments
Document Value
1040115447_Current_question_and.html
1040118364_Default_supporting_s.html
Asset priority threshold
1040120910_.html
1040121733_.html
Number
**Type
RCM Reference
1040123398_Template_filter.html
1040123402_Based_on_template_fi.html
Panel to show
1040124299_Subtype_1_reference.html
1040124302_Subtype_2_reference.html
1040124304_Subtype_3_reference.html
1040130812_Description_group_p.html
1040130816_Description_group_r.html
1040130929_.html
New currency
Reviewed
Receiving report printing
Profile
Package type
Package name
1040140214_Description.html
System
1040149356_Default_configuratio.html
1040149814_Safety_provision_ide.html
1040149821_SDA_identification.html
Title
Title
Title
Demand Description
Supplier
Site Transferred To
With sub-projects
Buyer
Supplier
Invoice
Title
Title
1040149968_Asset_health_report_.html
1040149976_RCA_identification_p.html
Recommended strategy
Increment by
Next Number
1040152168_Analytics_Settings.html
Use with checksheets
Name
1040168019_Properties.html
Asset status updates
Format of date values
1040170817_Properties.html
1040170831_Properties.html
Name
Name
Name
Name
Time zone
Validated field entry
Class
Warehouse
Sequence
1040178028_Properties.html
Name
Description
1040184806_Acknowledgment_metho.html
1040184808_Acknowledgment_metho.html
Name
Name
1040186138_AssetWise_Interopera.html
Profile
Strategy Development
Work orders
Manual request for work
1040191393_Production_Settings.html
1040191633_Value_List_Control_P.html
1040192628_Acknowledgment_failu.html
1040192630_Acknowledgment_failu.html
1040196966_Properties.html
Name
Name
Name
Name
Received by the office
Name
Agency
Work priority
Title
1040216474_Lab_fluid_sample_ide.html
1040216484_Cable_splice_identif.html
Name
1040217881_Reset_Characteristic.html
Title
Title
Send for approval
1040220500_Current_question_and.html
Plural
1040228874_Edit_Checksheet_Appr.html
1040228929_Edit_Inspection_Repo.html
1040231255_Linked_document.html
1040231257_Embedded_document.html
Task
1040234199_Reset_Characteristic.html
1040234416_Anomaly_risk_assessm.html
1040234645_1_Active_status_info.html
Maximum remaining life
1040237705_Reset_Inspection_Eff.html
1040244408_Properties.html
1040244526_Main_Degradation_tra.html
1040244543_Properties.html
1040244574_Welcome_message.html
1040244587_Main_Asset_Regulator.html
1040244690_Main_Asset_Circuits.html
1040244707_Main_RCA.html
RCA is required if the criticality index is or above
1040244824_Main_Fluid_Condition.html
Received by the office
1040245056_Production_loss_sett.html
1040245075_Main_Production_loss.html
1040245494_Main_Checksheet_appr.html
1040245516_Main_Anomaly_event_s.html
1040245593_Main_Regulated_gas.html
1040245647_Anomaly_risk_assessm.html
Projects
Create a work order
1040245824_Main_Alarm_and_ackno.html
1040245893_Main_Asset_Prioritiz.html
On creation
Projects
1040246276_Asset_prioritization.html
1040246387_Main_Asset_Condition.html
1040246464_Main_Restoration_Pla.html
1040246534_Main_SDA_settings.html
1040246602_Main_Failure_mode_cr.html
1040246674_Main_Action_plan_set.html
MTA2 Template
1040246903_Main_RCA_approvals_s.html
Route status
Route status
Creation
1040247033_Main_SDA_approvals_s.html
1040247073_Main_Failure_mode_se.html
Next Number
CMMS task label
1040248171_Main_RBI_damage_mech.html
1040248205_Main_RBI_confidence_.html
1040248214_Main_action_plan_fea.html
1040249913_Main_RBI_Demand_scen.html
1040250027_Main_RBI_Type_of_Ins.html
1040250510_Main_failure_mode_ve.html
1040250593_Main_Asset_Notes.html
1040250642_Main_Collector_Notes.html
1040250687_Main_SIF_HAZOP_analy.html
Route status
1040251116_Inspection_report_ap.html
Route status
1040251162_Main_inspection_repo.html
1040251197_Main_Critical_parts_.html
1040251273_Main_RFW_approvals_s.html
Route status
Creation status
1040253631_Main_Asset_health_re.html
Route status
1040254436_Main_Characteristics.html
Route status
Approval basis
1040254783_Main_Projects_Settin.html
Sent for approval
1040254899_Main_Projects_Approv.html
1040254970_Main_Inspection_effe.html
1040255088_Main_Checksheet_Spli.html
1040255224_Main_Oil_Gas_Specifi.html
1040255331_Main_Oil_Gas_Specifi.html
1040255377_Main_Oil_Gas_Specifi.html
1040255404_Main_Oil_Gas_Specifi.html
1040255432_Main_Oil_Gas_Specifi.html
1040255565_Main_Oil_Gas_Specifi.html
1040255597_Main_Oil_Gas_Specifi.html
1040255625_Main_Oil_Gas_Specifi.html
1040255659_Main_Oil_Gas_Specifi.html
1040255694_Main_Oil_Gas_Specifi.html
1040255729_Main_Oil_Gas_Specifi.html
1040255754_Main_Oil_Gas_Specifi.html
1040255780_Main_Oil_Gas_Specifi.html
1040255800_Main_Oil_Gas_Specifi.html
1040255915_Main_Oil_Gas_Specifi.html
1040255940_Main_Oil_Gas_Specifi.html
1040255968_Main_Oil_Gas_Specifi.html
1040255991_Main_Oil_Gas_Specifi.html
1040256013_Main_Oil_Gas_Specifi.html
1040256044_Main_Oil_Gas_Specifi.html
1040256078_Main_Oil_Gas_Specifi.html
1040256112_Main_Oil_Gas_Specifi.html
1040256139_Main_Oil_Gas_Specifi.html
1040256167_Main_Oil_Gas_Specifi.html
1040256200_Main_Oil_Gas_Specifi.html
1040256229_Main_Oil_Gas_Specifi.html
1040256252_Main_Oil_Gas_Specifi.html
1040256269_Main_Oil_Gas_Specifi.html
1040256288_Main_Oil_Gas_Specifi.html
1040256304_Main_Oil_Gas_Specifi.html
1040256320_Main_Oil_Gas_Specifi.html
1040256342_Main_Oil_Gas_Specifi.html
1040256363_Main_Oil_Gas_Specifi.html
1040256387_Main_Oil_Gas_Specifi.html
1040256409_Main_Oil_Gas_Specifi.html
1040256443_Main_Oil_Gas_Specifi.html
Economic severity
1040256746_Main_Safety_Provisio.html
1040256771_Safety_provision_app.html
Route status
Safety override incidents
Route status
1040256869_Main_Safety_Override.html
Abbreviation
Abbreviation
Abbreviation
1040259803_Main_Employee_securi.html
1040272033_Main_Reminders.html
Checksheet status rule
Gas types employees in this group can enter transaction types for
1040276748_Details.html
1040276769_Details.html
Type
1040276917_Details.html
1040277089_Details.html
1040277168_Details.html
Name
Requisition
1040277572_Details.html
1040277788_Details.html
Status of Removed Component
Create a failure record when an alarm is acknowledged
Indicator alarm state
Increment by
Title
1040281188_RCM_identification_.html
MTA2 templates
Remaining PF interval
Reliability strategy development
Currency
Approval of requisitions and requisition lines
Unit identification
Voucher numbers are automatically assigned
Employees
Profile
1040281385_RCM2_single_failure_.html
RCA is required if the criticality index is or above
Asset health reports
Second dashboard
Follow-up work
33719_Generate_XML_Documen.html
40024488_Data_Structure_Compo.html
40048477_File_to_import.html
40048490_Columns_to_import.html
Login name
File type
Send an email when this job finishes
40064378_Class_to_import.html
40104110_Import_destination.html
Match columns based on
40133877_Match_columns_Singl.html
40134386_Worksheet_selection_.html
Reference type
Direction
33719_Generate_XML_Documen_2.html
40024488_Data_Structure_Compo_2.html
40048477_File_to_import_2.html
40048490_Columns_to_import_2.html
Login name
File type
Send an email when this job finishes
40064378_Class_to_import_2.html
40104110_Import_destination_2.html
Match columns based on
40133877_Match_columns_Singl_2.html
40134386_Worksheet_selection__2.html
Reference type
Direction
Reason
Work Completion Status
Standard Document
1000032303_Component_Swapping_I.html
Component
Financial Period
Financial Period
Financial Period
Financial Period
1000032340_Transactions.html
Description
1000032576_Image.html
Component or Location
Date and time collected
Title
Transfer Date and Time
Received Date and Time
Time-Based Trigger Type
Parent asset
Copy the installed components
Warehouse
Asset to Use Rule
Title
Asset to Work on
Title
1000032949_Change_Next_Triggeri.html
Component or Location
1000033005_Contributing_Reading.html
Title
Availability
On Schedule
On Schedule
Trade
1000033071_Used_by_the_Cascade_.html
1000033097_Calculation_Input_Va.html
Schedule Template
Assumption
1000033127_New_Asset.html
Financial Period
Reason for status change
Life to Date
Asset Status
Title
Title
Description
Title
Area
Monitor date:
Area
Date and Time
Exception Trigger Occurs On
Work Order Task Title
Employee
1000033222_Costs.html
Task Number
Scheduled
Asset
Scheduling Priority Rule
Build child schedules
Financial Period
Asset Status
Create a failure
1000033416_History.html
Asset to Work On
Component or Location
Create a New Work Order
Create a New Work Order
Import Sub-projects
1000033506_Import_from_MS_Proje.html
Spare part information
1000033526_Transactions.html
Title
Manager
1000033539_History.html
Actual Costs
Title
Component to Install
Title
Status Change Type
New Project Status
Redrafted
New Date
Original Planned Completion Date
1000033577_Renumber_Work_Order_.html
1000033579_Renumber_Task____.html
Create a New Work Order
1000033585_Mobile_Computing_Act.html
Work order task
1000033593_Create_Simple_Schedu.html
1000033615_Asset_Details.html
Full Early Warning Expression
Rule for creating readings
Date and Time Acknowledged
Type
Type
1000033785_Asset_Selector.html
And/or
Type
Period type
Title
Title
Task Number
Show work orders for asset
1000034013_Calculation_Input_Va.html
Default planner
Create project file from
1000034075_Renumber_indicators.html
Description
Calculation
Maintenance group
Text of the Document
1000034228_Assign_to_Mobile_Com.html
Date and time collected
Analysis
Hierarchy location
1000034347_Asset_Function.html
Title
Title
Current Site
Status
Severity
Status
Asset
Indicator
Title
New
Failure mode
Locked
1000035431_Link_Failure_to_Work.html
Title
1000035434_Cancel.html
Resolved on
Task
Task
1000035454_Work_Order_Task_Rele.html
Task Number
Create pick list
Title
Title
Asset number or name
Consequence priority
Title
Title
Project type
Asset to Work On
Asset to Work On
Asset to Work On
Reason for cancellation
Work completion status
Existing task
Task Template for New Standard Task
Title
Title
Title
Resolved by
Title
Title
Start Date and Time
Job Template
Task
Asset to Work On
File
Type
Title
Hierarchy location
Title
Title
Title
Asset
Reason for cancellation
Work Order Task
Indicator
Asset to Work on
Task Number
Title
Title
Title
Asset
Asset
Show work orders for asset
1000035844_Work_With_Standard_T.html
Type
Title
Analysis
Only map assets that are at the same level of the hierarchy
Title
Target asset
Only map assets that are at the same level of the hierarchy
Resource mapping SQL
Employee mapping SQL
Maintenance group mapping SQL
Failure mode mapping SQL
Option
Asset
Status
Employee mapping SQL
Review status
Title
1000035966_Work_request_comment.html
1000035967_Close_Work_Request.html
Status
Group
1000035991_Import_Action_Plans.html
Analysis asset number
Type
Date and Time Acknowledged
Work Type
Task or Job
Task Type
Task Type
1040011038_Copy_Task.html
1040011056_Add_Task_Template.html
Based on Template
Title
Date and time collected
Title
Title
Work Order Task
1040014466_Apply_Template_Chang.html
Type
Title
1040015314_History.html
Type
1040015955_Function_description.html
1040015959_Functional_failure_d.html
1040015970_Functional_failure_r.html
Asset
Include descendant assets from the following hierarchy
Title
Failure Mode
Title
Title
Site
Function
Component or Location
Indicator
Asset
On
1040018274_Team_members_list.html
Title
Consequence priority
1040018390_Prioritization_analy.html
1040018413_Analysis_identificat.html
Functional Failure
Function
Work order
Title
Indicator
Source of Manufacturer’s information
Life Number
Generation Option
Title
Hierarchy location
Title
Title
Title
1040021333_Labor_requirements.html
Title
Title
Component or Location
Hierarchy location
Title
Date and time collected
Task Number
1040022678_Indicator_to_read.html
1040022696_RCM2_function_with_f.html
1040022816_Properties.html
Rule
Score
Usage
Description
Description
Severity name
Abbreviation
Abbreviation
Sequence
Consequence priority
Title
Failure mode
Employee
Duration
1040023100_Properties.html
1040023102_Properties.html
1040023112_Properties.html
Returned to service on
1040023525_Standard_Job_Add_Te.html
1040023546_Standard_Job_Copy_T.html
1040023565_Standard_Job_Copy_J.html
Work category
Sequence
**Work type
Parent problem
Description
Description
Include projects with this status in open project lists
Project details
Description
WBS name
Parent
Site or asset
1040023769_PM_generation_error_.html
Abbreviation
Abbreviation
1040024145_Indicator_collection.html
Mark as planned
Site
Work is Complete Status
Description
Description
Group name
Additional collection groups for indicator matching
Additional operating conditions for indicator matching
Additional technologies for indicator matching
Additional expected frequencies for indicator matching
Additional trade for indicator matching
Additional maintenance groups for indicator matching
Additional collection sets for indicator matching
Title
1040025123_Properties.html
1040025127_Properties.html
Abbreviation
Performed by
Description
Asset
Status name
Abbreviation
Description
Description
Abbreviation
1040027453_Properties.html
1040027455_Properties.html
1040027457_Properties.html
1040027459_Properties.html
1040027461_Properties.html
Title
Abbreviation
1040027469_Properties.html
1040027471_Properties.html
1040027473_Properties.html
Material classification
1040027477_Properties.html
1040027479_Properties.html
1040027481_Properties.html
1040027483_Properties.html
Severity ranking
Used With Assets
Description
Description
Service provider
Active
Primary trade
Expected frequency
Held by
Component or Location
1040027634_Standard_task_docume.html
Resource Type
Description
1040027660_Properties.html
1040027798_Readings_from_to_dat.html
RCM Reference
Analysis
Description of consequence
Reported by
1040028077_Asset_status.html
Work document type
1040028261_RCM2_Facilitation_R.html
1040028511_Gauge_circular.html
Asset
Number of Cycles
Trigger on Early Warning
Time-Based Trigger Type
Full Early Warning Expression
Consequence of Failure
1040029635_Gauge.html
1040029963_Specifications.html
Material Grade
1040030070_Specifications.html
Material Grade
Material Grade
Temperature
Work Order Status
Date Last Work Order Was Closed
1040030598_Primary_indicator_re.html
1040031130_Strategy_development.html
1040031510_Dashboard_gauge.html
1040032095_Gauge_linear_horizo.html
1040032098_Gauge_linear_vertic.html
1040032371_View_bar_info_linea.html
1040032851_Site_KPI_tabs_Gauge.html
Title
Expression type
Actual Costs
Start Date and Time
1040037662_Manufacturer_info_T.html
Title
Title
Task
Sorting sequence
Sorting Sequence
Sorting Sequence
Scheduler
Title
Number of Weeks
Week Number
Work Order Task Title
Work Order Task
Trade
Maintenance Group Rule
Asset to Work on
1040038786_Availability_Percen.html
Title
Integration status
Task number
Update previously analyzed assets
Problem
1040040278_Percent_complete_gau.html
Task
Title
Asset
Base interval
Site
Availability
Scheduled
Description
Barrier type
Parent
1040041061_Properties.html
Description
Description
Sequence
Time
Question 1
Sequence
Sequence
Sequence
1040042075_Asset_description.html
Title
1040042888_Readings_trend__rate.html
Evaluates
Description
Technology
Location
Material type
Degradation pattern
Wording
Evaluation form
Assign asset number as follows
Study
Evaluation form
Indicator template
Evaluation type
Evaluation form
1040044629_MTA2_strategy_radio_.html
Abbreviation
Consequence priority
1040045307_Corrosion_tracking_g.html
Title
Title
Note
Asset
Duration
Risk matrix entry
By
By
1040045887_Probability_evaluati.html
Starting value
Total repair costs
Failure Mode
Rate type to use
Sequence number
Prefix with
Asset
On
Tag:
Calendar period to show on graphs of indicator readings
Rule Alarm
Existing task
1040048227_Properties.html
Title
Show only...
Capacity
Reason
Confidence questionnaire
Description
Description
Asset
Evaluation form
1040050234_Context_indicator_id.html
Failure Mode
Asset
Abbreviation
Work order created from
1040050917_Follow_up_work_orde.html
1040050925_Follow_up_work_requ.html
Name
Material classification
Indicator
Work order created from
State
Value
On
End-of-life date
Rate name
Title
Description
Name
Title
Title
Selected yearly rate
Title
Multiple measurement points
Target
Track and acknowledge alarms by measurement point
1040053970_.html
1040054076_Degradation_descript.html
Title
New rate
Calculation
Number of inspections
1040055930_History.html
Confined space
Indicator state
1040057264_Dashboard_gauge_ci.html
1040057271_Dashboard_gauge_ho.html
1040057278_Dashboard_gauge_ve.html
1040057446_History.html
Selected yearly rate
1040058131_Proximity_of_inputs.html
On
Expected value
1040058669_Next_inspection_reg.html
Actual Costs
Calendar period to show on graphs of indicator readings
Asset
Primary asset health index
Recommendations
Title
1040059793_Planned_work_order_r.html
Asset recursion
Title
1040060024_Filter_criteria.html
Work planning
Sequence
Status
Checksheet type
1040061114_Operating_parameter_.html
Operations minimum
Description
Description
Description
Can be set manually
Description
Status
1040062040_Generate_Reading.html
Description
Description
Description
1040062893_Reading_description.html
1040062898_Comparative_analysis.html
1040062899_Comparative_analysis.html
Ranking
Title
Title
1040063558_Calculations_identif.html
Title
Completed by
Inspection factor
Collection group
Work classification
Indicator
1040064181_Comparison_indicator.html
Indicator
Indicator
Indicator
Indicator
Indicator
Indicator
Indicator
Indicator
Indicator
Indicator
Indicator
Indicator
1040064312_Filter_criteria.html
1040064314_Standard_job_filter_.html
1040064504_Filter_criteria_rela.html
Recommended strategy
Mechanism
Process
Location
1040065562_History.html
Report definition
Title
Model
Serial Number
Published on
1040066344_Recommendations.html
1040066372_Manufacturer_info_ba.html
Model
Model
Value changed
Model
1040066985_Manufacturer_info_b.html
1040067009_New_manufacturer_inf.html
Report status name
1040067472_Gauge.html
1040067632_Gauge_II.html
Title
Condition name
1040068118_Gauge_and_change_ico.html
1040068252_Component_swapping_i.html
New status
Type
Description
1040070118_Complete_Report_Gene.html
1040070164_Readings_lists_optio.html
1040070234_Options_assets_to_s.html
1040070945_Options_Calculation.html
1040070947_Options_Calculation.html
1040070949_Options_Calculation.html
1040070951_Options_Calculation.html
1040070953_Options_Calculation.html
FM Reference
Description
Abbreviation
Meeting date
Asset
Title
Meeting date
1040072768_Analyze_separately_.html
Local Effects
Meeting date
Meeting date
1040073228_RSS_Analysis_Comment.html
1040073229_RCA_Comment.html
Title
Title
Escalation status
Title
Title
Process
Description
Title
1040073473_Properties.html
Basic Causes
Sequence
Failure Mode
Failure mode
Acknowledged by
Project type
Evaluation type
Evaluation type
Evaluation type
1040074496_Economic_evaluation_.html
Function identification
1040074936_History.html
1040074955_Failures_analyzed_l.html
Downtime costs
Severity
Title
Project type
Asset
Title
Component or Location
Installed at
System
Occurred on
Reported by
Resolved on
Status
Problem
Hierarchy location
Failure mode
Properties can be changed
Type of RCA
Status
1040076373_Request_Project_for_.html
Project type
1040076460_Audit_Info.html
1040077032_History.html
Status
Properties can be changed
1040078028_Representative_degra.html
Report Type
Section
Report Type
Report Type
Planned activities end
Completed activities end
1040080536_Buttons.html
Operating parameter
Sequence
Report contents can be defined
Reference 1
Status
Asset
Status
1040081202_Source_indicator.html
Status
Request type
1040081647_Failure_mode_identif.html
Title
Asset
Trade
1040081775_Primary_failure_refe.html
Abbreviation
Likelihood of failure
Probability of failure
Likelihood of failure
Failure Mode
Demand rate
Style
Integrity parameter
Unit of measure
1040082596_Last_reading_date.html
1040082607_Validation_status.html
Title
1 - On-condition task
1040083075_RCM2_evaluation_comm.html
Analyze separately
RCM Reference
1040083362_Degradation_rates_no.html
1040083386_Indicator_identifica.html
1040083707_Move_Indicator_Templ.html
Title
Asset
Collection assigned to
1040083825_Indicators_to_read_s.html
Asset
Subtype 2 is supported on assets of this type
Title
Note
Name
Frequency
Functional failure
Failure cost
1040086253_Gauge_only_gauge_fo.html
1040086255_Gauge_only_gauge_fo.html
1040086257_Gauge_only_gauge_fo.html
1040086259_Gauge_only_gauge_fo.html
1040086261_Gauge_only_gauge_fo.html
Site
Description
1040086748_History.html
1040087481_Properties.html
Automatic Scheduling
1040087498_Work_order_options_g.html
Task Number
Status
Consequence priority
1040088393_Recommended_strategy.html
Title
1040088818_Selected_answers_det.html
1040088820_Selected_answers_sim.html
Project status
1040088969_Failure_analysis_con.html
1040088974_Failure_analysis_sta.html
Process
Asset
Title
Title
1040089634_Process_description.html
1040089637_Asset_description_wi.html
1040089640_Process_description_.html
1040089645_Degradation_descript.html
1040089709_Time_between_failure.html
Severity
Severity
Selected yearly rate
Selected yearly rate
Weighting
Weighting
Risk matrix
Risk matrix
Asset
Title
MTTF for random failures
Mean time between multiple failures
Time to repair
Asset Used to Calculate Costs
1040092190_Indicator_instructio.html
Used with failure mode criticality evaluation
First trade
Fifth trade
1040093570_Risk_summary_and_plo.html
Report Name
1040093977_History.html
Report definition to use for published edition
Source
Type of planned activities to include
Direction
1040094257_Asset_hierarchy_radi.html
1040094259_Asset_hierarchy_radi.html
1040094262_Asset_hierarchy_radi.html
Section Type
Section
Asset
Asset
State
Health Index
Status
Status
Start date
Status
Failure effect
1040094665_Operating_parameter_.html
Start date
Completed date
Start date
Completed date
Start date
Planned reading date
Completed date
Start date
Start date
Start date
Planned reading date
Planned reading date
Completed date
Asset
Likelihood of failure and demand rates
Description
Description
Report Name
Report Name
Published by
1040095437_Site_options_group_b.html
Severity
Weighting
1040096373_Asset_snapshot.html
Unit of measure
Time
Avoidance savings
Report Name
Title
1040097236_Selected_demand_scen.html
Task Attachments
1040097867_.html
Team member options
Risk matrix
Risk matrix
Unavailability of the protective device (Utive)
Protected function (Mted)
Allowed time between multiple failures (Mmf)
Protected function (Mted)
Protected function (Mted)
Protected function (Mted)
Protected function (Mted)
Protected function (Mted)
Asset type site settings
Risk matrix
Risk matrix
Report Name
Asset activity report section
Published
Number of failures every...
Name
Confidence factor
Title
Asset
Completed activities end
Planned activities end
First trade
Title
Title
Title
Asset number
Asset number
1040100971_Mark_Request_As_Comp.html
1040100980_Mark_Request_As_Canc.html
Create work document
1040101024_Selected_FM_Degradat.html
Create work document
Indicator to Read
Evaluation type
Evaluation form
By
Asset
Checksheet
1040101720_.html
First trade
Section Title
Asset
1040102354_Tasks_period_cost.html
Number of point readings required for a valid reading
Title
Asset number
Asset number
Asset number
Asset number
Asset number
1040103353_Source_MAP_indicator.html
Asset
Note
1040103629_Failure_Finding_Calc.html
Title
1040103854_ETBF_read_only.html
1040103856_ETBF_editable.html
Asset
On
Downtime costs
1040104582_Probability_of_failu.html
1040104583_Probability_of_failu.html
1040104584_Economic_control_alt.html
1040104585_Economic_control_sta.html
1040104586_Health_and_safety_c.html
1040104587_Health_and_safety_c.html
1040104588_Environmental_contro.html
1040104589_Environmental_contro.html
1040104590_Reputation_control_a.html
1040104591_Reputation_control_s.html
Severity selection policy
Failure mode criticality
Style
1040105675_Questionnaire_evalua.html
Labor costs
1040106048_Properties.html
1040106062_Properties.html
Temperature
Description
Evaluation form
Design code
Material Grade
Material Grade
Material Grade
Material Grade
Material Grade
Lining life
Employee
Item performed
Status
Category
Classification
Type
Comments
Downtime
Extension
Title
Reason
Status
Asset
1040109275_History.html
Detail instructions
1040109358_Incident_Document.html
1040109600_Add_Comment.html
Recommendation
Method
Time
Override incidents
Provision number
Evaluation category and question
Elapsed time
SIL numeric value
Type
Status
Status
1040111357_History.html
Inspection regime
1040112551_Indicator_identifica.html
1040112555_Failure_mode_identif.html
Provision level
Probability
1040112627_Probability_referenc.html
1040112637_Economic_worksheet_s.html
Risk relevant
1040112652_Economic_worksheet_s.html
Risk relevant
1040112665_Economic_worksheet_s.html
Risk relevant
Description
Can be sent for approval
Evaluation form
1040112998_SDA_identification.html
Calculate risk level
1040113377_Study_system_identif.html
Name
Integration status
Requested extensions
Used when tasks are not justified
Explanation for category 2
Explanation for category 2
Explanation for category 2
Explanation for category 2
Category 1
Category 1
Category 1
Category 1
Title
Ranking
Calculation
Checklist item
Local Effects
Number
1040115032_Readings_from_to_dat.html
1040115156_New_Calculation.html
Failure pattern
1040115318_SIF_details_and_str.html
1040115472_Failure_mode_text_gr.html
Operating condition
Work classification
Degradation Pattern Supported on failure modes
Degradation Mechanism supported on failure modes
1040115763_Provision_earned_val.html
1040115766_Provisions_earned_va.html
Title
Type
Title
Impact
Set number
Override condition
Override approach
Asset
Unit of measure
Description
Numeric frequency
Task
1040116780_Overall_risk_level.html
1040116977_Risk_level_high_scor.html
Evaluation category 2
Evaluation category 2
Evaluation category 2
Evaluation category 2
Evaluation category 1 is applicable
Title
1040117875_.html
1040117885_.html
1040117901_imodel_item_properti.html
Modification type
Risk level
Specifications panel
Shutdown type
Shutdown type
Shutdown type
Title
Title
Type
Type
Type
Asset
Title
Functional failure
Title
Planned Release Method
Planned Release Method
First trade
Form can be changed at analysis time
Form can be changed at analysis time
Description
Description
Task title
Resources required by date
Asset operating condition
Title
Title
Title
Analysis status
Repairs costs
1040120518_View_bar_info.html
1040120553_View_bar_info.html
Title
Title
1040120766_Operating_Conditions.html
Sequence
1040120806_.html
Description of consequence
Comparison
1040120885_Technology.html
Numeric equivalent
Description
Assigned to
Can be sent for approval
Failure costs
Title
Title
Response time unit of measure
Shutdown name
Title
1040122052_Request_Project_for_.html
Analysis Description
Title
Consequence priority
Title
Title
Status
1040122255_RCA_Comment.html
Title
Level
Level
Follow-up action
Description
Process
Temperature range
Flow
Load type
Description
Description
Description
Start
1040123109_Properties.html
Technology
1040123189_Material_classificat.html
1040123193_Material_type_option.html
Collection window type
1040123247_Asset_type_filtering.html
1040123254_Maintenance_Group_Fi.html
1040123260_Work_Type_Filters.html
1040123264_Work_Classification_.html
1040123270_Frequencies_filters.html
1040123273_Technologies_filters.html
1040123276_Operating_conditions.html
Failure Mode
Version
Provision number
1040123475_Source_functional_fa.html
1040124161_Provision_level_grou.html
Classification
Master system
Equipment number
Title
1040124480_Collection_frequency.html
1040124483_Collection_frequency.html
Title
Title
Change Set
1040125018_Version_comparer_act.html
Override maximum usage
Condition
Type of document
1040125081_Provision_SafetyPro.html
Legacy reference number
Type
Function
Asset
1040126045_Task_description_for.html
1040126176_Evaluation_note.html
Mitigated probability
Description
1040126443_Lining_condition_ref.html
Number of copies
Parent asset
Parent asset
Parent asset
Title
Title
Title
Title
Distances
1040127808_Reading_subtype_1_re.html
1040127810_Reading_subtype_2_re.html
1040127812_Reading_subtype_3_re.html
Survey information is supported on readings
Title
Work Order Created
Asset
Functional failure
Abbreviation
Unwanted situation
MTTF for random failures
Calculate avoidance savings
Classification
Location
Mechanism
Probability
Next regulatory inspection
1040129209_Specifications.html
Average pipe burial
Right burial percent
Minimum clearance
Position and orientation
Displaced items
Clock position
Soft maximum
Intermediate soil type
Configuration
Description
Description
Description
Description
1040129568_Properties.html
Description
Description
Description
Risk level
Category 1
Calculate risk level
Description
1040130489_Failure_mode_identif.html
1040130572_Asset_identification.html
Title
State
Analysis
Total costs
Total repair costs
Cost equation
Materials
Secondary damage costs
Number
Evaluation type
Evaluation type
Evaluation type
Probability
Trade
Evaluation type
Evaluation type
Evaluation type
Evaluation type
Total costs
Time
Adjusted likelihood of failure
1040133254_FM_compare_failure_.html
Estimated time between consequences
Task
Task
Task
Task
Measurement point description
RCM Reference
Indicator state
Value collected
Measurement point description
1040134611_Reading_value_indic.html
1040134613_Reading_value_numer.html
1040134687_Asset_identification.html
Date and Time Acknowledged
Based on
Thickness
Sequence
Sequence
Acknowledged By
1040135499_Analysis_asset_ident.html
1040135504_Analysis_primary_ass.html
Ranking
Failure Mode
1040136198_RSS_Analysis_Comment.html
1040136308_PF_interval_control.html
1040136311_Failure_finding_inte.html
1040136318_Useful_life_control.html
1040136323_Regulatory_frequency.html
1040136353_PF_interval_control_.html
1040136356_Failure_finding_inte.html
1040136361_Useful_life_control_.html
1040136373_Modification_type_co.html
Category 1
Category 1
Category 1
Category 1
S - Safety
Title
Title
1040136833_APM_Standard_job_tas.html
Response time unit of measure
Title
Title
Title
Indicator to Read
1040138324_Specifications.html
Subtype 2 is supported on readings of this type
Subtype 2 is supported on measurement points of this type
Override maximum usage
Title
1040139025_Failure_description.html
Preventable
1040139707_Analysis_team_facili.html
Trade
Number of Action Plans
Number of Action Plans
Indicators and states notes
Material
Severity
Used with
Abbreviation
1040141423_Action_plan_details_.html
1040141444_Action_plan_details_.html
1040141468_Action_plan_details_.html
1040141492_Action_plan_details_.html
PF interval
Title
1040141744_FM_renumber_control.html
1040141746_Action_plan_renumber.html
1040142121_Standard_job_referen.html
Title
1040142228_Incorrect_reading_in.html
Title
Title
Asset name
Show asset properties
Asset type
1040145294_Primary_asset_group_.html
Title
1040146513_MAP_RBI_inspection_f.html
1040146516_MAP_RBI_inspection_f.html
Inspection Summary
Title
Sequence
Report type
1040146819_Photos_to_show_and_B.html
Title
1040146903_History.html
Title
1040147110_Measurement_Point_Re.html
1040147114_Measurement_Point_Re.html
1040147118_Measurement_Point_Re.html
1040147122_Measurement_Point_Re.html
1040147126_Measurement_Point_Re.html
Report type
Title
Asset
1040147284_Override_Task_Due_Da.html
Collection starting date
Create or link to a failure and anomaly
Create or link to a failure and anomaly
Component or Location
1040148410_Workflow_Summarize_.html
Report type
1040148440_Workflow_step_Analy.html
Inspection Summary
1040148474_Workflow_Identify_a.html
1040148825_Create_or_Link_to_In.html
1040149104_Copy_Failure_Mode_Va.html
1040149158_Move_Task_Template.html
1040149715_Filter_criteria.html
Title
Maintenance group
Work order task
Standard Task
1040151195_Readings_from_to_dat.html
Asset
Asset
1040152096_Work_Document_Creati.html
On
1040152601_FF_for_use_on_Econom.html
1040152665_Failure_finding_inte.html
1040152670_PF_interval_control_.html
1040152673_Useful_life_control_.html
Cancel Work Order
Extension
Operations
Work order task
Reading
1040153872_Inspection_Report_Ph.html
1040154311_Workflow_Develop_in.html
Failure finding interval
Asset to Work on
1040154668_Acknowledgment_metho.html
1040154671_Acknowledgment_metho.html
Percentage complete
Title
1040155582_Workflow_Default_pa.html
Recommendations
Asset
1040156254_Propose_Task_Next_Du.html
Inspection summary
1040156757_.html
Regulatory frequency
1040156886_PF_for_use_on_Econom.html
1040156893_Useful_life_for_use_.html
Type
Selected yearly rate
Planning and analysis assigned to
Work classification
Sequence
Sequence
Sign-off status
Checksheet type
Title
Inspection summary
1040159007_Inspection_Activity.html
Title
Status
1040159494_Workflow_Define_loo.html
Title
1040159504_New_checksheet_detai.html
Damage mechanism
Damage mechanism
Due date is tracked for this task
Title
Abbreviation
Modification type
Trade
Trade
Modification type
1040160268_Internal_document_id.html
Analysis type
Title
Sequence
Date and time collected
Title
Title
Title
1040161309_Work_order_reference.html
Abbreviation
Assigned to
1040161756_.html
Functional failure
Hole size
Collected By
This Reading is Lower Than the Previous One
Site
Site
Site
Link to restoration plan
Site
Title
Title
Title
Title
Sequence
Capitol
1040163574_History.html
1040163617_Asset_Restoration_Pl.html
Site
Total consequences
Condition
Link to condition analysis
Create pick list
Asset
Capitol
Sequence
Financial period
Hierarchy location
Relative risk
Relative risk
Total consequences
1040165015_Secondary_axis_indic.html
1040165017_Secondary_axis_indic.html
1040165023_Secondary_axis_indic.html
Title
1040165185_Step_Select_existin.html
1040165202_Asset_identification.html
1040165267_Step_Identify_the_a.html
1040165268_Step_Summarize_the_.html
Requested Completion Date
1040165270_Step_Describe_the_p.html
1040165275_Step_Wait_for_plann.html
Sequence
Task Number
Failure mode
1040165403_Step_Link_to_existi.html
1040165415_Step_Select_existin.html
1040165417_Step_Enter_acknowle.html
Component or Location
1040166692_Properties.html
Description
1040167035_Workflow_Default_pa.html
Title
1040167245_Step_Select_standar.html
1040167251_Step_Select_standar.html
Work priority
Project type
Unwanted situation
Project type
Project type
High risk
Title
1040168276_Risk_plot_options.html
1040168318_Risk_plot_single_tar.html
High risk
Acknowledged By
Probability of failure
1040168852_Spending_plan.html
High risk
1040169277_.html
1040169336_Asset_for_analysis_r.html
ID
ID
Name
Characteristic name
Class
Characteristic class
Characteristic
Gas type
Abbreviation
Vendor Name
Abbreviation
Abbreviation
Calibrated by
Gas container
Trade
1040170633_Filters_right_side.html
Expected frequency
1040170664_Filters_right_hand_s.html
Container number
Performed by
Characteristic class
1040170979_Step_Select_failure.html
Vendor
Description
Description
Description
Description
Description
Description
Description
Description
Abbreviation
Description
Title
Description
Description
Description
Description
Description
Description
Sequence
Title
Sequence
Description
Description
Description
Group property entry
Site
Name
Site
1040171985_Properties.html
Name
Name
Name
1040173348_Step_Identify_the_a.html
1040173395_Asset_types_options_.html
User is required to acknowledge the instructions when entering a transaction
Maximum weight
Abbreviation
Gas type
1040173712_Properties.html
Site
Asset type
Character case
Asset
Update the form’s process step
Class
Class
Asset to use
1040174111_Start.html
Name
Reuse asset
Name
1040174474_Construction_form_E.html
1040174504_Construction_form_E.html
1040174609_Construction_form_E.html
Reuse asset
Name
Reuse asset
Name
Name
Reuse asset
Site
Title
Only the child asset is being replaced
1040175864_Generate_Asset_Progr.html
Conflict resolution
1040175889_Serial_number_and_re.html
Title
1040176022_Change_Indicator_Bas.html
1040176163_Indicator_triggering.html
1040176165_Indicator_triggering.html
1040176437_Source_property_lef.html
Characteristic name
Form status
Description
Description
Program profile detail
Asset type
Name
Number of details per group
1040177643_Number_of_details.html
City
Program profile
Document class
This Reading is Lower Than the Previous One
This Reading is Lower Than the Previous One
Asset
Status
1040178719_Construction_form_a.html
Profile detail
1040178852_Properties.html
1040178883_Properties.html
1040179007_Description.html
1040179078_Properties.html
1040179093_Properties.html
1040179226_Task_Inspection_Docu.html
File folder
Title
Title
Title
Properties can be updated
Site
New asset status
Title
Status
Title
Work title
Title
1040180581_Filter_criteria_rela.html
Asset status
1040180603_Status_change_detail.html
Title
Work title
1040180723_APM_work_order_refer.html
Work title
Work title
Reading
Checksheet
1040181696_Generate_Asset_Progr.html
1040182016_User_entered_serial_.html
Title
Description
Title
1040182095_Interop_work_order_c.html
1040182100_APM_work_order_contr.html
Cycle
1040182235_Interop_solution_pac.html
Request type
Asset type
Form
1040183284_Instructions_Rich_T.html
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Reuse asset
Manufacturer
1040184072_Construction_form_E.html
1040184097_Construction_form_E.html
Gas weight
1040184573_Construction_form_c.html
Status
Create or link to a failure and anomaly
1040184885_Acknowledgment_metho.html
Asset
Work title
1040184952_APM_work_order_refer.html
1040185137_APM_work_order_task.html
Title
Title
Title
Title
Title
1040185297_Asset_reference_with.html
Asset type
Name
Title
Time between failures
Time between failures
Time between failures
Request for work submission
Work title
1040188040_Work_order_reference.html
Description
Description
Description
Description
Description
1040190046_Failure_modes__curre.html
1040190065_Failure_modes__new_v.html
New cause
Cause
Asset number
Type
Checksheet type
Description
Description
Life cycle is complete
1040191108_Change_Downtime_Stat.html
Type
Description
Description
Description
Properties can be updated
Calculate the cost of lost production
1040191615_Asset_product.html
Description
Description
Description
1040192029_APM_work_order_task.html
1040192034_Interop_work_order.html
1040193039_Influx_Reading.html
Indicator to Read
Server URL
Title
Sequence
Description
Rule set
1040194627_Properties.html
1040194667_Properties.html
Analysis status
Analysis status
1040194892_Transaction_gas_weig.html
Part name
Parts catalog item
1040195153_Product_unit_of_meas.html
1040195158_Product_unit_of_meas.html
Indicators and states notes
1040195560_Workflow_Facilitate.html
Alarm Type
1040195835_Check_Live_4d_Indica.html
Time between failures
Time between failures
Time between failures
Time between failures
Time between failures
Damage code
1040196729_Filters_left_hand_si.html
Asset
Damage code
Damage code
1040197919_Remove_Overrides.html
1040197974_Entries.html
1040198483_.html
1040198500_.html
1040198517_.html
1040198519_.html
1040198521_.html
1040198523_.html
1040198525_.html
1040198527_.html
1040198529_.html
1040198531_.html
1040198533_.html
1040198535_.html
1040198537_.html
1040198539_.html
1040198541_.html
1040198543_.html
1040198545_.html
1040198547_.html
1040198549_.html
1040198551_.html
1040201617_.html
1040201727_.html
1040201837_.html
1040201947_.html
1040202057_.html
1040202167_.html
1040202277_.html
1040202390_.html
1040202500_.html
1040202506_.html
1040202648_.html
1040202654_.html
1040202660_.html
1040202666_.html
1040202672_.html
1040202678_.html
1040202684_.html
1040202690_.html
1040202696_.html
1040202702_.html
1040202708_.html
1040202714_.html
1040202720_.html
1040202726_.html
1040202732_.html
1040202738_.html
1040202744_.html
1040202750_.html
1040202756_.html
1040202762_.html
Abbreviation
Abbreviation
Title
Manufacturer
Manufacturer
Manufacturer
Manufacturer
Manufacturer
Street or Office/area
1040204726_Fluid_sample_info.html
Indicator to Read
Asset type
Template
1040206451_New_Lab_Fluid_Sample.html
Settings name
Type
Type
Interop status
Title
Title
Title
1040207482_Send_for_approval.html
Title
Asset
Note
1040208020_Source_asset.html
1040208038_Source_checksheet.html
1040208045_Source_standard_task.html
1040208054_Source_interop_work_.html
1040208059_Source_interop_work_.html
1040208066_Source_request_for_w.html
1040208075_Source_solution_pack.html
1040208080_Source_asset_program.html
1040208085_Source_asset_change_.html
1040208090_Source_asset_activit.html
1040208095_Source_lab_fluid_sam.html
1040208096_Source_cable_splice.html
1040208177_Source_task_template.html
1040208182_Source_solution_pack.html
1040208199_Properties.html
Work title
1040208270_Source_safety_overri.html
1040208275_Source_gas_transacti.html
1040208276_Source_production_lo.html
1040208352_Cable_splice_details.html
1040208413_History.html
1040208563_Properties.html
1040208597_Properties.html
1040208613_Properties.html
1040208629_Properties.html
1040208646_Properties.html
Description
1040208995_Properties.html
Type of test
1040209303_History.html
Manufacturer
Label
1040209849_Level_1_agency.html
1040209857_Level_2_agency.html
1040209864_Level_3_agency.html
Type
Type
Name
Name
Name
1040211050_Interop_work_order_r.html
1040211177_Circuit_assets_indic.html
Degradation
Title
Title
Asset category
1040212112_Details_tab_group_bo.html
Title
Title
Title
City
Title
Title
Label prefix text
Label prefix text
Label prefix text
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Title
Asset
Lab sample type
Status
1040214708_Minimum_values_with_.html
Failure effect
Assets of this type represent a circuit
Time to repair
Downtime costs
1040215136_Fluid_sample_bottle_.html
1040215147_Fluid_sample_syringe.html
Reason for request
1040215344_Properties.html
Duration
Useful Life
1040215590_Construction_detail_.html
1040215601_Construction_detail_.html
1040215611_Properties.html
Contaminant
Type
1040216025_Networks_distributio.html
1040216106_Fluid_condition_VAF_.html
1040216120_Fluid_condition_from.html
Tab name
1040216429_Asset_specifications.html
1040216430_Asset_specifications.html
1040216432_Asset_specifications.html
Name
Inspection summary
Sequence
Title
Fluid type
Title
Title
1040217832_Asset_link_1.html
1040217837_Asset_link_2.html
1040217842_Asset_link_3.html
1040217847_Asset_link_4.html
1040217852_Asset_link_5.html
Asset bar code validation
1040218040_Asset_with_bar_code_.html
1040218048_Asset_without_bar_co.html
1040218717_Properties.html
1040218771_Properties.html
1040218799_Properties.html
Canceled
Title
1040219110_Task_description_for.html
1040220263_Inspection_strategy.html
1040220270_Properties.html
Life cycle is complete
Title
Description
Severity
Meeting date
1040220631_New_Review.html
Description
Sequence
1040221559_Inspection_plan_revi.html
Failure Mode
1040221820_Review_Summary.html
1040221892_Source_inspection_pl.html
Failure Mode
1040222197_Identification_indic.html
1040222434_Create_checksheet_fr.html
Failure mode criticality
Name
State
1040223693_Source_SDA.html
1040223702_Source_RCA.html
1040223707_Source_asset_analysi.html
1040223712_Source_Failure.html
1040223717_Source_downtime_inci.html
1040223722_Source_safety_provis.html
1040223736_Source_inspection_re.html
1040224359_Solution_package_lev.html
1040225109_Fabric_reading_speci.html
Title
Title
Title
Title
Title
Title
Hard type
1040225889_Acknowledgment_comme.html
Material Grade
Material Grade
Description
Description
Description
Description
Description
Description
Description
Contaminant
1040227506_Construction_form_E.html
Assignment type
1040228245_Properties.html
1040228265_Properties.html
Task status
Title
Title
1040228908_Checksheet_Type_Appr.html
Unit of measure
Description
1040229467_Properties.html
Performed by
Checklist item
Description
Checklist item
Checklist item
1040229574_Properties.html
1040230050_Approval_settings.html
Description
1040230372_Properties.html
Notes
Failure mode criticality
Description
1040230735_Properties.html
Description
Description
Description
Description
Description
Description
Title
1040231301_Properties.html
1040231407_Properties.html
1040231529_Properties.html
1040231561_Properties.html
1040231580_Properties.html
1040231717_Instructions_text.html
1040231758_Send_Checksheets_for.html
1040233172_Properties.html
Title
1040233356_Checksheet_percent_c.html
Abbreviation
Anomaly classification
Title
Anomaly classification
Evaluation form
Evaluation form
Number of trades
On
Default risk assessment result
1040234116_Failure_code_1_conte.html
1040234119_Failure_code_2_conte.html
1040234122_Failure_code_3_conte.html
1040234144__Failure_code_1_cont.html
1040234147__Failure_code_2_cont.html
1040234148__Failure_code_3_cont.html
Description
1040234382_Failure_code_1.html
1040234385_Failure_code_3.html
1040234389_Failure_code_2.html
Status
Assets of this type support structural minimum thickness
Long-term rate
Site
1040235730_Source_anomaly_event.html
1040235745_Failure_Creation_Inf.html
Title
1040235949_Properties.html
1040235967_Properties.html
1040235991_Properties.html
1040236009_Properties.html
1040236033_Properties.html
1040236054_Properties.html
1040236075_Properties.html
1040236096_Properties.html
1040236117_Properties.html
1040236138_Properties.html
1040236156_Properties.html
1040236180_Properties.html
1040236198_Properties.html
1040236222_Properties.html
1040236243_Properties.html
1040236264_Properties.html
1040236285_Properties.html
1040236306_Properties.html
1040236324_Properties.html
1040236430_Asset_specifications.html
1040236500_Properties.html
1040236661_Properties.html
1040236713_Asset_specifications.html
Inspection effectiveness
1040237149_Economic_evaluation_.html
Sequence
Sequence
Description
Inspection strategy
Inspection strategy
Question level used with
Description
Title
Reason
Title
Set name
Description
Monitoring
1040238916_Planning.html
Description
Description
Sequence
Description
Toxicity index NFPA Nh
Description
Sequence
Abbreviation
Description
Description
Oil preservation system type
1040241491_Properties.html
Description
1040242446_Move_Reading.html
Description
1040243584_Severity_environment.html
1040243589_Severity_environment.html
1040243602_Severity_safety_rea.html
1040243605_Severity_safety_edi.html
1040243606_Severity_economic__.html
1040243607_Severity_reputation_.html
1040243608_Probability_read_on.html
1040243609_Severity_economic__.html
1040243610_Severity_reputation_.html
1040243611_Probability_editabl.html
1040243653_Properties.html
Name
1040244367_Solution_package_lev.html
1040244368_Solution_package_lev.html
1040244369_Solution_package_lev.html
1040244370_Solution_package_lev.html
1040244381_Solution_package_cyc.html
1040244384_Solution_package_ste.html
Allow degradation tracking for assets of this type
Assets of this type support structural minimum thickness
Long-term rate
Second level regulatory information is supported for assets of this type
1040244989_Checksheet_Type_Flui.html
1040245440_Checksheet_Type_Appr.html
1040245673_Risk_assessment_Sett.html
Production loss events can be reported against assets of this type
1040246115_Fluid_condition_sett.html
1040246128_Fluid_Condition_Sett.html
1040246132_Approval_Settings_fo.html
Restrict gas standards
Long-term rate
Planner group
Activate indicators that are currently inactive for collection
Limit units of measure to units in the time category
Team member options
Team member options
Team member options
Approval route option
1040248021_Failure_mode_critica.html
Positive adjustments
1040248652_Properties.html
1040248673_Properties.html
1040248695_Properties.html
1040248720_Properties.html
1040248743_Properties.html
1040248768_Properties.html
1040248790_Properties.html
1040248814_Properties.html
1040248836_Properties.html
1040248860_Properties.html
1040248882_Properties.html
1040248904_Properties.html
1040248926_Properties.html
1040248948_Properties.html
1040248972_Properties.html
1040249011_Properties.html
1040249033_Properties.html
1040249167_Asset_specifications.html
Likelihoods of failure
1040250248_Failure_mode_critica.html
RCM2
RCM2
RCM2
1040251109_Approval_Settings_fo.html
1040251452_Properties.html
1040251471_Properties.html
1040251490_Properties.html
Description
1040251534_Properties.html
1040251557_Properties.html
1040251576_Properties.html
1040251595_Properties.html
1040251618_Properties.html
Description
1040251658_Properties.html
1040251752_Specifications.html
1040252264_Solution_package_lev.html
1040252267_Solution_package_lev.html
1040252270_Solution_package_lev.html
1040252273_Solution_package_lev.html
1040252276_Solution_package_cyc.html
1040252279_Solution_package_ste.html
Title
Asset number
Title
Description
Criticality
Degradation type
1040253310_Specifications.html
1040253346_Properties.html
1040253370_Properties.html
Description
Date and time collected
1040253835_Degradation_Rate.html
1040253882_Confidence_analysis_.html
Asset
1040254053_Splits.html
1040254502_Inspection_factor_ma.html
1040254503_Integrity_group_Insp.html
Inspection effectiveness rule
Supports checksheet splitting
Can be split
Failure mode criticality
Asset specifications can be defined for assets of this type
1040256579_Indicator_without_ba.html
1040256583_Indicator_with_bar_c.html
Type
Title
Work type
1040257344_Properties.html
1040258160_Asset_focused_UX_In.html
1040258229_Asset_degradation_vi.html
Description
Size start
Date and time collected
Evaluation form
Request for work submission
Title
Status
Title
Asset
Title
1040261510_Comparison_asset_2_d.html
1040261873_Comparison_asset_1_d.html
Early collection date
Date and time collected
Accumulated Value
Damage mechanism
1040263366_simple_or_detail_eva.html
1040263367_simple_or_detail_eva.html
1040263368_simple_or_detail_eva.html
1040263369_simple_or_detail_eva.html
1040263386_Evaluation_result_Sa.html
1040263388_Evaluation_result_En.html
1040263391_Evaluation_result_Re.html
Title
Title
Title
Acknowledgement Status
Asset
This Reading is Lower Than the Previous One
Title
Title
Description
Description
1040265801_Update_Assignment_In.html
1040266177_Description_or_instr.html
Date and time collected
Sequence
1040266616_Properties.html
Description
1040266910_Failure_effects.html
Intermediate Effects
Local Effects
Intermediate Effects
Failure effect
1040267019_Health_and_safety_co.html
1040267021_Environmental_contro.html
1040267023_Reputation_control.html
1040267034_Analysis_Note.html
Total repair costs
Downtime
1040267843_Analysis_note.html
Intermediate Effects
Acknowledged By
1040269619_WorstCase_Effects.html
Description
Description
Description
Description
Description
Description
Description
1040269699_Properties.html
1040269849_Asset_specifications.html
Local Effects
Intermediate Effects
Failure
Abbreviation
Detectability
1040270187_Detectability.html
1040270190_Detectability.html
Abbreviation
Title
Assigned to
Status
Asset
Damage code
Due date
Title
Show target line
Checksheet
Type
1040274458_Properties.html
Title
**Site name
1040275471_Details.html
Name
**Site name
1040275514_Details.html
1040275551_Details.html
1040275575_Details.html
Section Type
1040275603_Details.html
1040275631_Details.html
Asset
Title
1040275683_Details.html
1040275694_Details.html
1040275708_Details.html
**Site name
1040275734_Details.html
Prioritization Analysis Criterion
**Site name
1040275778_Details.html
**Site name
1040275804_Details.html
Task template
1040275832_Details.html
**Site name
Program profile detail
**Site name
**Site name
1040275906_Details.html
**Site name
**Site name
Title
Change request type
**Site name
Title
Request type
**Site name
Title
Request type
**Site name
Title
Request type
**Site name
Title
Request type
**Site name
Assigned to
Title
1040276209_Details.html
Site
1040276233_Details.html
**Site name
Title
1040276274_Details.html
Asset
**Site name
1040276341_Details.html
1040276353_Details.html
1040276365_Details.html
1040276377_Details.html
1040276389_Details.html
1040276401_Details.html
1040276417_Details.html
1040276429_Details.html
1040276441_Details.html
1040276453_Details.html
1040276478_Details.html
1040276490_Details.html
1040276504_Details.html
1040276516_Details.html
1040276574_Details.html
Asset type
1040276606_Details.html
Asset type
1040276632_Details.html
Component
**Site name
**Site name
1040276696_Details.html
Asset
**Site name
**Site name
Asset
1040276797_Details.html
**Site name
Material type
1040276837_Details.html
**Site name
1040276902_Details.html
1040276939_Details.html
1040276952_Details.html
**Site name
**Site name
Damage mechanism
Failure mode
1040277051_Details.html
1040277063_Details.html
**Site name
1040277101_Details.html
1040277113_Details.html
Asset
Asset
1040277154_Details.html
1040277180_Details.html
1040277192_Details.html
1040277204_Details.html
1040277216_Details.html
1040277228_Details.html
1040277240_Details.html
1040277292_Details.html
**Site name
1040277343_Details.html
FM Reference
FM Reference
1040277385_Details.html
1040277399_Details.html
**Site name
1040277425_Details.html
FM Reference
1040277457_Details.html
1040277470_Details.html
1040277484_Details.html
1040277496_Details.html
1040277508_Details.html
1040277520_Details.html
1040277533_Details.html
Triggering Rule
1040277599_Details.html
1040277617_Details.html
**Site name
Function
1040277745_Details.html
1040277776_Details.html
**Site name
1040277813_Details.html
1040277860_Details.html
1040277874_Details.html
1040277885_Details.html
**Site name
1040277911_Details.html
Title
**Site name
Resource
**Site name
**Site name
**Site name
**Site name
1040278017_Details.html
Title
Analysis type
Analysis type
Risk matrix
Relative risk threshold
1040280534_Properties.html
Asset
Intermediate Effects
1040281593_Failure_effects_disp.html
Title
Preventable
Title
Intermediate Effects
Sequence
Inspection report is created
Eligible for work order assignment
Inspection summary can be updated
Allow work orders to be matched to a checksheet with this status
1040284005_Failure_effects_sin.html
1040284136_Properties.html
1040284535_Collectors_note_grou.html
Indicator
Title
Asset to Work on
Work classification
First subtype
Minimum indicators to read
Mobile computer type
Primary trade
Purchased by
1000032482_Transactions.html
Approval Status
Warehouse
Spare - matching status for components
On-hand
Unit asset
Title
Title
Title
Title
Title
Title
Secondary location
Location
Inventory Group:
Title
ABC classification
Title
On Hand
Resource
Description
Description
Sequence number
Inventory group type
Asset status for material resources
Description
Description
Description
Sequence number
Title
Title
Transfer From Warehouse
Site
**Site name
Resource
**Site name
Enum Value Name
Type of menu element
Sequence number
31297_Data_Type.html
Folder
Override the general security level for specific elements
Default security level
Heading
Grouping Relationship
32731_Generate_Report.html
32742_Subtype.html
Menu label
Header Text
32758_Customize_a_Class.html
Appearance
This condition And/Or in the group must be true
Color
And/Or
Direction
33522_Save_As.html
Attribute to use for filtering
Attribute to use for filtering
33946_Attachments.html
34390_Customize_a_Report.html
Attribute to use for filtering
Attribute to use for filtering
35757_Relationship_State.html
35878_Mass_Update_Data_Mem.html
Text for graph
Axis Name
Gauge style
Start value
Data series name
40003970_Change_Control_Joinp.html
Member Name
40012837_Filter_criterion.html
This condition And/Or in the group must be true
Add to existing group
Type
40015109_Control_State.html
Authentication type
Scale maximum
Marker style
Pointer end color
ID
ID
Category ID
40025319_Preview_______.html
To
Add to existing group
Class Name
Digit color
Include this report on the Print menu
Name
Background color
Global Variable
Attribute to use for filtering
40048159_Calculation_Result.html
40048259_Evaluate_Calculation.html
Background color
Attribute to use for filtering
40052247_Test_Calculation.html
Style
Description
Activation Status
Scope
This value
Variable description
40063156_Calculation_name.html
Member Name
Variable description
From
Sequence
40065973_Show_UI_Text_Usage.html
This value
40066572_Preview_2.html
40066852_Gauge.html
40066919_UI_text.html
Attribute to use for ordering
Unit of measure to use
40067116_Selection_criteria.html
Attribute to use for ordering
40067404_Variable_identificat.html
Appearance
Scoping
Condition
Attribute to use for filtering
Next
Recurrence pattern
Condition
Condition
Reference
40083575_Question_and_answers.html
40083602_First_question_contr.html
Class to edit
40084050_.html
Class
type
40091286_Auditing_controls_gr.html
40095810_Relationship_propert.html
Type of Relationship
Hide time when displayed in lists
40100518_Products.html
Height
40100841_Selection_logical_op.html
40101171_Assertions.html
Subject
Other Web map
Type
URL
Parameters
40113179_Web_map_tile_service.html
40114024_Export_Configuration.html
40117899_Properties_____.html
Plugin name
Authentication type
40137701_English_and_translat.html
Type
40140874_Local_language_panel.html
40140887_New_Translation.html
Attribute to update
Plugin name
Description
40150349_.html
40150460_.html
40163326_Feature_state.html
40163837_.html
40163853_.html
40163865_.html
40163877_.html
40163896_.html
40163922_.html
40164469_Change_Time_Zone.html
Background color
Background color
Period to analyze
40175497_SelectiOn_logical_op.html
UI Text
Attribute to use for filtering
40231472_Excel_properties_sel.html
Category ID
40272451_Configuration_Info.html
40273407_Pointer_properties.html
Alignment
40276289_Details_______.html
Attribute to use for filtering
Number
Rate
1000032493_Web_Page.html
Closed Date
Country
Title
Reason Changed
Reason Changed
Reason Changed
Reason Changed
Reason Changed
Supplier
Title
Title
Title
Approval Status
Example Catalog Quantity
Resource
1000033863_Accept_RFQ_Prices.html
Award RFQ
Resource
Entered by
Title
Demand Description
RFQ
Supply resource in this category
Name
Reason Changed
Reason Changed
City
1000034038_Bid_Sheet.html
1000034047_Award_RFQ.html
1000034053_Accept_RFQ_Prices.html
1000034054_Accept_RFQ_Prices.html
Award RFQ
Resource
Resource
Resource
Purchase Order
New
Title
Purchase Order Line
Resource
Resource
Line
Line
Number
Number
Number
Supplier
Document Type
Document Type
1000035679_Pricing_Zone.html
Name
Title
1040033429_Primary_contact.html
Address type
Title
Purchasing type
Ordering Units
Discount Rate
Minimum Order Quantity
Unit of Measure
Bid status
1040033661_Contractor_informati.html
Resource
Resource
Rate
Remitted to Supplier
Type of Change
Title
Line Being Charged
Override Cost Type
Description
Tax Rate
Name
Invoice Date
Invoice
Invoice
Used With
Purchase Order Line
Used to hold liabilities
Supplier
Title
Title
Description
Entered On
Supplier
Purchase Order Line
Rate
Asset to charge
Percentage of Value
Tax Rate
Resource
Number
City
Received at
Description
Description
Description
Discount percent
Description
Description
1040036402_Properties.html
Activating a supplier
Description
**Under authority of
Create Contract
Send to
Date returned
Expiry date
RFQ Status
RFQ resource status
Rate
RFQ
Resource
RFQ number
Status
1040043907_Price_Detail_subnote.html
Override Cost Type
Work Order to Charge
RFQ
RFQ
1040066116_Invoice_balancing_to.html
1040066118_Invoice_balancing_to.html
1040066120_Invoice_balancing_to.html
Priority
Subject
Extension
1040141837_Contact_information_.html
Date Promised
Second Expedite Date
City
Subject
Cover page
Extension
Supplier
Supplier
Supplier
Street or Office/area
Reversal invoice
Site
Resource
**Site name
1040276878_Details.html
**Site name
RFQ Supplier
**Site name
Resource
Resource
Resource
1040277702_Details.html
Batch template
Name
Email address
1040146467_Processing_job_stati.html
1040268053_Processing_info.html
1040268203_Asset_Data_Loader_Pr.html
1040268742_Asset_Hierarchy_Data.html
This site works best with JavaScript enabled