Evaluation type Evaluation forms can have these types: • Simple – The evaluator can select one statement for each category on the form. • Detailed – The evaluator can select two statements for each category on the form. See Also Total costs APM calculates the total cost by adding the lost production, repairs, labor, secondary damage, and other costs. See Also Severity Severity indicates the relative criticality of the consequence when a failure occurs. See Also Note Additional information about the analysis. Notes are collected and available in several locations. See Also