Text that automatically appears in the Failure Effects box of new failure modes. The user can change the text as needed.
Text that automatically appears in the Task box of new action plans. The user can change the text as needed.
When Only entries in the usage groups selected below are available is selected, failure modes can be based on library entries assigned the specified usage groups. This means that, when you browse for library entries to add to an RBI analysis, entries with the selected usage groups are included in the list to select from. Usage groups that are not selected are not included in the list.
This option can be selected when Only entries in the usage groups selected below are available is selected. When you browse for library failure modes to add to an RBI analysis, entries that are not assigned to a usage group are included in the list to select from.
• The selected rate is fixed – the rate is always set manually
• The selected rate is variable – the rate is set automatically whenever rates are calculated. Choose the auto-selection policy.
• Use the standard APM calculation – The calculation supplied by APM
• Use this calculation – Select the custom calculation from the list
• Automatically add indicators – when an inspection task is added, indicators currently on the action plan are added to the standard task, if they are not there already. When indicators are subsequently added to the action plan, they are automatically added to the task.
• Failure mode asset – the barrier is assigned to the asset on the failure mode by default
• Primary asset – the barrier is assigned to the primary asset on the analysis by default
When this option is selected, the Optimization view is available in the analysis window. Using the integration functionality in APM, you can export failure modes from MTA2 and RCM2 analyses to the Isograph® Availability Workbench (AWB), where you can analyze and optimize the data. You can then import optimization results into the APM analysis, review the recommendations in the Optimization view, and make appropriate changes to the action plans.
Tip: The analyst can add information to the Analysis Note and Evaluation Note tabs located in the Details view, if available.
• Use evaluation forms – The analysis team uses wizards to evaluate the probability of failure, economic consequences, health and safety consequences, environmental consequences, and confidence factors. APM then calculates the risk and shows it in the risk matrix. This process is commonly used with RBI analyses.
• Use weighted severity and relative risk – The analyst assesses the severity of economic, health and safety, and environmental consequences, assigning a number (weighting) to each factor. The analyst also enters the probability of failure and the confidence factor. APM then calculates the relative risk and shows it in the risk matrix.
• Not performed – No risk analysis is performed.