|
When this option is selected, checksheets with this status display the Planning view. The checksheet must have been generated from a standard task and the checksheet type must support the feature.
When this option is selected, a regulatory inspection is noted and the next due-date is calculated (using the regulatory frequency on the indicator). The Regulatory inspection option must be selected on the checksheet for this to work.
By default, all statuses are available for selection. To refine the list, select Only the statuses selected below are available and select the statuses.
When this option is selected, checksheet inspection notes (Checksheet window, Readings view, Inspection Notes tab) can be updated.
When this option is selected, the Modification Inspection view appears in the Checksheet window.