Requesting Follow-up Work from an Inspection Report
Tip: To view the follow-up work that has been created for indicator readings in the report, select the Follow Up tab.To Request a Follow-up APM Work Document
1. In the Inspection Report window, select the Inspection Report view and the Readings tab. This tab displays all of the processed indicator readings from the checksheets included in the report.
2. Select the reading and click Follow-Up Work. The Request Follow-up Work dialog appears. Here is an example when APM work documents are used:
4. If you selected Work order, select the method for creating the document. The options are:
• From scratch – Add a new work order. See step 5.
• From standard job – Browse to select the appropriate standard job. Select the requested completion date
• From standard task – Browse to select the appropriate standard task. Select the requested completion date
• If the site settings specify that work documents must be approved, Send for approval to is selected by default. Select the approval route
6. Click OK. The Request Follow-up Work dialog closes. The Work Request or Work Order Task window appears.To Request a Follow-up Request for Work
1. In the Inspection Report window, select the Inspection Report view and the Readings tab. This tab displays all of the processed indicator readings from the checksheets included in the report.
2. Select the reading and click Follow-Up Work. The Request Follow-up Work dialog appears. For example:For information about completing the request for work, see Creating a Request for Work from Scratch.To Request a Follow-up SAP Maintenance Order
1. In the Inspection Report window, select the Inspection Report view and the Readings tab. This tab displays all of the processed indicator readings from the checksheets included in the report.
2. Select the reading and click Follow-Up Work. The Request Follow-up Work dialog appears. Here is an example when SAP documents are used:
3. To use an existing maintenance order, select the New or existing document list and click “Existing document”.
• Select the maintenance order and click OK. The maintenance order number and description are displayed in the dialog.
• Click OK to add the follow-up work to the reading. It is listed in the inspection report’s Follow Up Work tab.
4. To create a maintenance call, select Maintenance plan manual order call.
• Select the maintenance plan and click OK. The maintenance plan’s identifier and description are displayed in the dialog.
• Click OK to add the follow-up work to the reading.
5. To create a maintenance order, select the New or existing document list and click “New document”.
•
• Click OK. The Request Follow-up Work dialog closes. The maintenance order is created in SAP and its number and title are returned to the record in APM. The maintenance order is added to the indicator readings’ follow-up work. It is listed in the inspection report’s Follow Up Work tab.To Request a Follow-up SAP Notification
1. In the Inspection Report window, select the Inspection Report view and the Readings tab. This tab displays all of the processed indicator readings from the checksheets included in the report.
2. Select the reading and click Follow-Up Work. The Request Follow-up Work dialog appears.
3. In the Type of document list, select “Notification”. The Request Follow-up Work dialog changes as follows:
4. To use an existing notification, select the New or existing document list and click “Existing document”.
• Select the notification and click OK. The notification number and description are displayed in the dialog.
• Click OK to add the follow-up work to the reading. It is listed in the inspection report’s Follow Up Work tab.
5. To use a new notification, select the New or existing document list and click “New document”.
• In each of the Breakdown, Location, Item, Task and Activity, and Description tabs, review and change the values, as needed.
• Click OK. The Request Follow-up Work dialog closes. The notification is created in SAP and its number and title are returned to the record in APM. The notification is added to the indicator readings’ follow-up work. It is listed in the inspection report’s Follow Up Work tab.