Requesting Follow-up Work from an Inspection Report

When reviewing indicator readings on an inspection report, you might identify corrective action to be performed on the indicators’ assets. You can select readings and request a work document for follow-up work.
Once created, follow-up work orders and work requests must go through the normal planning and approval processes in the same way as other work orders and work requests.
If you are using AssetWise Enterprise Interoperability (AWEIS) to exchange data with a CMMS system (for example, SAP Plant Maintenance), the site’s interoperability profile determines whether APM work requests and work orders or requests for work are used.
If APM is configured to interact with a SAP Plant Maintenance system, the site’s interoperability profile determines whether APM work requests and work orders or SAP maintenance orders and notifications are used.
Tip: To view the follow-up work that has been created for indicator readings in the report, select the Follow Up tab.
This topic explains how:

To Request a Follow-up APM Work Document

1.
In the Inspection Report window, select the Inspection Report view and the Readings tab. This tab displays all of the processed indicator readings from the checksheets included in the report.
2.
Select the reading and click Follow-Up Work. The Request Follow-up Work dialog appears. Here is an example when APM work documents are used:
3.
4.
If you selected Work order, select the method for creating the document. The options are:
From scratch – Add a new work order. See step 5.
From standard job – Browse to select the appropriate standard job. Select the requested completion date
From standard task – Browse to select the appropriate standard task. Select the requested completion date
5.
If the site settings specify that work documents must be approved, Send for approval to is selected by default. Select the approval route
6.
Click OK. The Request Follow-up Work dialog closes. The Work Request or Work Order Task window appears.

To Request a Follow-up Request for Work

1.
In the Inspection Report window, select the Inspection Report view and the Readings tab. This tab displays all of the processed indicator readings from the checksheets included in the report.
2.
Select the reading and click Follow-Up Work. The Request Follow-up Work dialog appears. For example:
For information about completing the request for work, see Creating a Request for Work from Scratch.

To Request a Follow-up SAP Maintenance Order

1.
In the Inspection Report window, select the Inspection Report view and the Readings tab. This tab displays all of the processed indicator readings from the checksheets included in the report.
2.
Select the reading and click Follow-Up Work. The Request Follow-up Work dialog appears. Here is an example when SAP documents are used:
3.
To use an existing maintenance order, select the New or existing document list and click “Existing document”.
Select the maintenance order and click OK. The maintenance order number and description are displayed in the dialog.
Click OK to add the follow-up work to the reading. It is listed in the inspection report’s Follow Up Work tab.
4.
To create a maintenance call, select Maintenance plan manual order call.
Select the maintenance plan and click OK. The maintenance plan’s identifier and description are displayed in the dialog.
Click OK to add the follow-up work to the reading.
5.
To create a maintenance order, select the New or existing document list and click “New document”.
The following information from the functional location or equipment is displayed:
Planning and maintenance plants
Planner group
Main work center
Location, room, plant section
ABC indicator
The site’s interoperability profile determines which default values you can change for the new maintenance order.
In each of the Details, Location, and Description tabs, review and change the values, as needed.
Click OK. The Request Follow-up Work dialog closes. The maintenance order is created in SAP and its number and title are returned to the record in APM. The maintenance order is added to the indicator readings’ follow-up work. It is listed in the inspection report’s Follow Up Work tab.

To Request a Follow-up SAP Notification

1.
In the Inspection Report window, select the Inspection Report view and the Readings tab. This tab displays all of the processed indicator readings from the checksheets included in the report.
2.
Select the reading and click Follow-Up Work. The Request Follow-up Work dialog appears.
3.
In the Type of document list, select “Notification”. The Request Follow-up Work dialog changes as follows:
4.
To use an existing notification, select the New or existing document list and click “Existing document”.
Select the notification and click OK. The notification number and description are displayed in the dialog.
Click OK to add the follow-up work to the reading. It is listed in the inspection report’s Follow Up Work tab.
5.
To use a new notification, select the New or existing document list and click “New document”.
The following information from the functional location or equipment is displayed:
Planning and maintenance plants
Planner group
Main work center
Location, room, plant section
ABC indicator
The site’s interoperability profile determines which default values you can change for the new notification.
In each of the Breakdown, Location, Item, Task and Activity, and Description tabs, review and change the values, as needed.
Click OK. The Request Follow-up Work dialog closes. The notification is created in SAP and its number and title are returned to the record in APM. The notification is added to the indicator readings’ follow-up work. It is listed in the inspection report’s Follow Up Work tab.