Total cost of lost production
Monetary cost of asset downtime in the event of failure. The amount is shown in the site’s currency.
See Also

Total repair costs
Monetary cost to repair equipment in the event of the asset’s failure. The repair cost does not include labor. The amount is shown in the site’s currency.
See Also

Total labor costs
Monetary cost of labor in the event of the asset’s failure. The amount is shown in the site’s currency.
See Also

Total costs
APM calculates the total cost by adding the lost production, repairs, labor, secondary damage, and other costs.
See Also

Lost production quantity
In detailed evaluations, lost production quantity is calculated based on the cost equation’s intervals, which specify monetary values and quantities per duration (for example, hours).
See Also

Severity
Severity indicates the relative criticality of the consequence when a failure occurs.
See Also

Analyzed by
The analysis team member who performed the evaluation.