• Create a new work order: If appropriate, select a standard task, task template, standard job, or job template on which to base the new work order.
• Add a new task to an existing work order: Select a work order on which the new task will be created. If appropriate, select a standard task or task template on which to base the new task.
• Link to an existing work order task: Select an existing work order task to link to. The system creates the link without changing the planning information on the work order and task.
• Create a new work request: When you click OK, the work request is created. This option is enabled if you are creating a work document from a failure record.
• Total: the asset’s performance has decreased to a point where the asset is no longer performing at its required level. The asset has completely failed.
• Partial: the asset’s performance has decreased to a point where it is no longer performing one of its functions at the specified levels. The asset is still functioning.
• Potential: a condition that has been noticed that would result in an actual failure if the problem is not resolved. The actual failure has not yet occurred. Potential failures are normally reported as the result of an indicator reading that has raised a warning alarm against the asset.