Adding Services to a Task Template
Overriding GL Accounts
To Add a Service Requirement to a Task Template
3. Select the Planning tab. This tab shows the planning information for the task, as well as a list of trades, materials, tools, and services currently selected for the task.Note: By default, APM calculates the estimated duration of the task based on the time requirements for labor, tools, and time-based service requirements. To provide the estimated duration manually, clear the Calculate options and enter the value in the Estimated duration boxes.
4.
5. On the General tab, enter the following:
The total number of items that are required. For example, the number of employees or contractors required for the trade or the number of tools.
The amount of time that each service is required. For example, enter how long each worker will need to work on this task. The total time entered for the requirement will be calculated as:Number Of x Required For
Number of x Required for
• Start to start (SS): The requirement starts when the task is planned to start, offset by any entered lag time.
• Finish to finish (FF): The requirement ends when the task is planned to end. The system automatically calculates the required lag time.
This setting is used when calculating the estimated duration of the task, and when the task is scheduled.
7. If you are changing a task template that is already linked to standard tasks, you can apply the changes to the standard tasks. To do this, from the Task menu select Apply Changes. APM asks you to confirm that you want the changes made on the standard tasks. Click Apply.