Solution package level steps are defined at
The solution package level at which steps can be defined for this site.
See Also

Package name
The label corresponds to the name of the solution package level, for example, “Maintenance plan”.
APM automatically names the package with a sequential number. You can change the name to another unique string.
See Also

Step name plural
Plural form of the step name for display in the user interface.
See Also

RFW triggering horizon
Triggering horizon (for example, 30 days) for requests for work. Requests for work are generated when checksheet planning dates are within the horizon.
See Also

Create failure events for breakdowns
When this option is selected, the other failure options become available.
See Also

Description
The description of the item. You can use this box to include any additional details.