Risk level
Risk value for the failure mode. This is the highest score from the consequence severity evaluations.
See Also

Calculate risk level
APM automatically calculates the failure mode’s risk level based on the consequence severity evaluations. When this option is cleared, the calculation is bypassed and the analyst can select a risk level manually.
See Also

Earned risk reduction
Total of the SIL values from the safety provisions on the failure mode.
See Also

Calculate earned risk reduction
When this option is selected, the earned risk reduction is the total of the safety provisions added to the failure mode. When earned risk reduction is not calculated, the analyst can select a level from the list.
See Also

Mitigated risk level
Remaining risk after the earned risk reduction has been subtracted from the failure mode’s risk level.
See Also