Consequence priority Condition In a prioritization analysis, the consequence priority number indicates the relative importance of an asset in the site. APM calculates the priority number by comparing the failure consequence scores to a set of rules. The higher the priority number, the greater the asset’s criticality. In a condition analysis, APM determines the asset’s condition value by comparing the asset’s scores to a set of rules. If the asset’s scores match a rule, the asset is assigned that rule’s condition value. See Also Total consequences The total of the scores for each of the consequences selected for the asset. See Also