Linking a Work Request to a Work Order Task
If the purpose of the work request and work order is to resolve the asset’s full, partial, or potential failure, you can create a failure record to document the failure or anomaly and track its resolution. You can view the new failure record from the work order task’s Activity view. The failure record is automatically given the status Open and its source is shown as “Work Request”.To Link a Work Request to a Work Order Task
2. From the Tools menu, select Create or Link to Work Order. The Create or Link Request to Work Order dialog appears.
• Create a new work order: If appropriate, select a standard task, task template, standard job, or job template on which to base the new work order.
• Add a new task to an existing work order: Select a work order on which the new task will be created. If appropriate, select a standard task or task template on which to base the new task.
• Link to an existing work order task: Select an existing work order task to link to. The system creates the link without changing the planning information on the work order and task.
• Create a new work request: When you click OK, the work request is created. This option is enabled if you are creating a work document from a failure record.
5. If the purpose of the request is to resolve a failure, select the Failure Info tab.
6. Select Create a failure.
7. Select a failure mode or problem:
• If problems have been defined for the asset type, select a suitable problem from the Problem list. The selected problem’s description, failure type, and failure classification are copied to the failure record.
9. On the Description tab, enter or modify the description of the failure as needed.
• Total: the asset’s performance has decreased to a point where the asset no longer performs at its required level. The asset has completely failed.
• Partial: the asset’s performance has decreased to a point where it no longer performs one of its functions at the specified levels. The asset is still functioning.
• Potential: a condition has been noticed that would result in a failure if the problem is not resolved. Potential failures are most often reported when an indicator reading raises an alarm against the asset.
13. When you specify a PF interval, APM periodically recalculates the time remaining until a full failure can be expected. If you wish to prevent APM from changing the PF interval, select Locked. The PF interval remains at its current level until it is changed manually.
14. Click OK. The system opens the new or existing work order.Tip: If you specified that a failure be created, you can view and edit the failure record on the work order task. Select the Activity view, expand the Failures node, and select the failure. Information about the failure is shown in the right pane. You can double-click the failure’s icon to open the failure record.
15. You can now continue planning the work order task. When you are finished entering information about the task, you can:To Link Work Requests From a Work Order Task
3. From the Planning view, select the Source tab and then the Work Requests tab. The table lists work requests already linked to this work order task.
4. Click Browse and make your selection from the Select Work Requests dialog. The list shows work requests from the same site as the work order task, with a status of New, or with an approval status of Approved (if approval is required).
5. Click OK.