Task number APM automatically generates this number. Standard tasks and task templates share a numbering system and must have unique identifying numbers from each other. A standard task cannot have the same number as a task template. You can override the default number if necessary. If this box is left blank or if the number is not unique, an error message will appear. See Also Title The name or short description of this item. You can enter up to 250 characters. Asset to Work on The name and number of the asset that the work will be performed for. To select an asset, click the Browse button. If your organization includes multiple sites, the asset to work on and the work order must be owned by the same site. See Also Number The identification number of the equivalent document in the CMMS. Status The status of the matching document in the CMMS. Type The type of SAP task list can be: • E - Equipment • A - General • T - Functional location Group number Task lists are grouped into task list groups. A task list group includes all maintenance task lists with similar maintenance flows (for example, oil changes for cars and trucks). Task list counter Task lists within a task list group are identified by a group counter.